Similar Projects
Unit 4 Cooling Tower Fan Replacement
Bidding
Springfield, IL

Vienna Grade School HVAC Replacement - Phase 2
Bidding
Vienna, IL 62995

2B Cooling System Upgrade
Post-Bid
Romeoville, IL

L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

HVAC Equipment Replacement
Results
Evanston, IL 60201

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

HVAC Upgrades
Bidding
Less than $100,000 est. value
Chebanse, IL 60922

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

2020 Community Center HVAC Replacement
Results
Lake Zurich, IL 60047

D100 Fenton HS Auto Shop Exhaust Replacement
Post-Bid
Bensenville, IL 60106

Habitat for Humanity Senior Rehab Program
Results
Moline, IL 61265

Last Updated 04/15/2021 11:51 AM
Project Title

Cobden High School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Cobden, IL 62920   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $740,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under Base Bid and Alternate Bids to include removal of existing system(s) to install new mechanical packaged rooftop unit(s) system. New work under Base Bid to include new roof top mechanical unit on new roof curb, electrical work, structural steel work, new controls, test and balance, gas line extension, painting, and dust collection vacuum system work. Corresponding structural, mechanical, electrical, and plumbing work will also be included.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents