Similar Projects
HVAC Maintenance and Repair Services
Term Contract
Sub-Bidding
$100,000 CJ est. value
Calhoun, KY 42327

Rowan County Detention Center HVAC System Preventative Maintenance
Term Contract
Sub-Bidding
Morehead, KY 40351

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC RTU Unit for Courthouse
Alteration
Results
Calhoun, KY

Lappin Hall / Allie Young Air Handlers Unit Replacement
Alteration
Results
Morehead, KY 40351

Mechanical Services for Bluegrass Station Lexington
Term Contract
Sub-Bidding
$525,000 CJ est. value
Paris, KY 40361

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Upgrades
Alteration
Results
Columbia, KY

Architectural / Engineering Construction Manager Services for Bath County High School
Renovation, Infrastructure
Post-Bid
$4,000,000 est. value
Owingsville, KY 40360

HVAC Install at Carr Creek Lake
Term Contract
Results
Sassafras, KY 41759

Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Monroe County High School HVAC Renovation
Alteration
Results
Tompkinsville, KY 42167

HVAC Replacement
Alteration
Post-Bid
Central City, KY

OET HVAC Controls Upgrades and Repairs
Alteration
Results
$225,113 est. value
Somerset, KY 42501

Last Updated 10/07/2022 11:33 AM
Project Title

HVAC Renovation Graves County Middle School

Physical Address View project details and contacts
City, State (County) Mayfield, KY 42066   (Graves County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center - 09/19/22
Owner View project details and contacts
Architect View project details and contacts
Description

Generally, the project consists of a complete HVAC renovation to the existing 93,100 sq-ft middle school facility. Work shall consist of demolition, installation of all acoustical ceilings, roofing replacement, metal wall panel installation, water heater replacement, installation of geothermal piping systems, water source heat pumps, ductwork, insulations, dedicated ventilation air systems, HVAC controls, kitchen hood and make-up air systems, installation of electrical power, lighting, and lighting controls. The trades involved include but are not limited to: ceilings, roofing, plumbing, HVAC, mechanical, insulation, geothermal, controls, and electrical. Electronic copies of the documents may be obtained through Paducah Blueprint for $50.00 non-refundable fee. The refundable portion of the deposit will be refunded for the return of complete sets (in usable condition) within fourteen (14) days after the bid opening. NO REFUNDS WILL BE MADE AFTER THE FOURTEEN (14) DAY RETURN PERIOD. TIMES FOR COMPLETION A. Start of Work: It is anticipated that a contract will be awarded soon after the bid opening, but that construction will not start on the project site until March 2023. B. Substantial Completion. Subject to the conditions of Article "Delays and Extensions of Time" of the General Conditions, the total work to be done under this combined construction contract shall be commenced upon execution of the contract agreement and shall be substantially completed in phases no later than July 19, 2024. C. Final Completion. Subject to the conditions of Article "Delays and Extensions of Time" of the General Conditions, the total work to be done under this combined construction contract shall be fully completed in phases no later than within thirty (30) consecutive calendar days from the Date of Substantial Completion .

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents