Similar Projects
Utilities - US 81
Infrastructure
Design
Less than $1,030,000 est. value
Dover, OK 73734

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Widen and Resurface
Infrastructure
Results

Hennessey REAP Waterline Project
Infrastructure
Results
Hennessey, OK

US 51 - Utilities
Infrastructure
Design
$818,850 est. value
Hennessey, OK 73742

Month Bid List for Poly Culvert Pipes all Sizes
Term Contract
Post-Bid
OK

Slabjacking and Subsealing Services
Infrastructure
Results

Widen and Resurface - SH 33
Infrastructure
Design
$12,927,251 CJ est. value
Kingfisher, OK 73750

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Widen and Resurface - SH 33
Infrastructure
Design
$5,995,000 CJ est. value
Kingfisher, OK 73750

Health Department Drive Through and Storage buildings
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Kingfisher, OK 73750

Grade, Drain, Bridge and Surface - SH 33
Infrastructure
Design
$13,780,000 CJ est. value
Kingfisher, OK 73750

6 Month Bid List for Road and Bridge Materials and Commercial Roadway Work for all Districts
Infrastructure
Post-Bid
Kingfisher, OK

Last Updated 10/18/2022 06:32 AM
Project Title

2022 CDBG Drainage Improvements

Physical Address View project details and contacts
City, State (County) Hennessey, OK 73742   (Kingfisher County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the regrading of existing drainage ditches and driveway/street culvert replacement along Mitchell Road, Oklahoma Street, & Oak Street in Hennessey, OK.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents