Similar Projects
Mechanical Services for Maintenance and Repairs of Pumps at Water Plants
Infrastructure
Bidding
Baytown, TX

Artesia Pump Station Well Nos - 7 and 8 Drilling and Construction
Infrastructure
Bidding
$10,000,000 est. value
San Antonio, TX 78219

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Pump
Post-Bid
Austin, TX

Pump Repair
Term Contract
Results
$65,000 est. value
Plano, TX 75023

Pump Repairs for Utilities Department
Results
$879,300 est. value
Corpus Christi, TX 78401

Seguin Water Treatment Plant Surface Water Booster Station Pumps VFD Replacement
Renovation, Infrastructure
Bidding
$250,000 est. value
Seguin, TX 78155

Houlihan Well
Post-Bid
Aubrey, TX

Pump Repairs Trinity River Pump Station
Results
Dayton, TX 77535

Construction of Westwood Shores MUD, Water Well No. 2 and Well 1 Improvements
Infrastructure
Bidding
$280,000 est. value
Curtis, TX 75951

Well Service
Post-Bid
Bushland, TX 79012

Wharton Well and Water Plant Contract No. 1 - Pump and Control Building, Storage Tank, and General Site Work Contract No. 2 - Well Construction
Results
$1,800,000 to $2,500,000 est. value
Wharton, TX

Sienna North Pump Station No. 1 and South Pump Station No. 2 Pump Retrofit
Infrastructure
Bidding
$800,000 est. value
Richmond, TX

Allamoore Test Well
Post-Bid
$75,000 est. value
Sierra Blanca, TX

Simsboro Aquifer Water Treatment Plant, Well Field and Transmission Facilities
Results
$35,000,000 est. value
Bastrop, TX

Reported 07/21/2022 12:00 AM
Project Title

West Side Water Well 2 Replacement

Physical Address View project details and contacts
City, State (County) Livingston, TX   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Drill and complete approximately 450 foot deep new water well with 8-inch steel casing within the confines of the West-Side Water Treatment Plant. Install concrete encasement at wellhead. Install well pump system, piping and appurtenances to connect to existing water system. Abandon existing inoperable 8-inch well of approximately 457 foot depth, remove existing concrete encasement at wellhead, and remove approximately 110' of existing water main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents