Similar Projects
New Gym Floor Demo and Replacement at The Englewood Campus
Bidding
CO

Secondary Building Gymnasium Floor Refinishing
Bidding
Dove Creek, CO

Painting and Fencing On-Call Single Trade Services
Post-Bid
Denver, CO 80202

ACC DQ 20-6-1018 Carpet Replacement (Tandus)
Post-Bid
Colorado Springs, CO

Paint For Bldgs: 68, 69, 70, 71 & 105 - Golden, Co
Results
Less than $56,000 est. value
Lakewood, CO

CU South 1st Great Hall Renovation Paint / Carpet
Results
Less than $50,000 est. value
Aurora, CO 80045

Grand Junction Regional Airport Flooring Replacement
Construction
Grand Junction, CO 81501

On-Call Painting Projects - Countywide
Term Contract
Bidding
Brighton, CO

Lowry Classroom Flooring
Post-Bid
Aurora, CO

Mercury Removal Services Package 02
Results
Colorado Springs, CO 80905

Summit Hall 4th Floor Corridor Flooring
Bidding
Fort Collins, CO 80521

Wood Floor & Carpet Cleaning And Maintenance
Post-Bid
Lone Tree, CO

Mercury Removal Services Package 01
Results
Colorado Springs, CO 80905

NRRC-D Building Carpet Replacement
Bidding
Fort Collins, CO 80526

1161 Transit Drive - Floor Leveling
Post-Bid
Colorado Springs, CO 80903

Last Updated 12/15/2020 03:41 AM
Project Title

Health Department Painting and Flooring Replacement

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Flooring, Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of painting and flooring replacement in two rooms of the Health Department building located at 1555 N 17th Avenue, Greeley, Colorado 80631. This project will consist of general contractor performing painting and flooring renovations to two rooms in the existing building. Work shall include: 1. Remove and store all equipment and furnishings located in the rooms during renovation. Once work is completed, all equipment and furnishings shall be put back in original positions. 2. Remove and replace plumbing fixtures as necessary to facilitate new work. 3. Patching all walls. 4. Paint walls and door frames. 5. Remove existing sheet vinyl flooring and install new Mannington Bio-Spec flooring. Color to match existing exam rooms. 6. Remove and properly dispose of all trash generated by construction activities off site. 7. The project will be permitted through the Weld County Building Department. Fees for Weld County building permits will be waived. Any other fees to be paid by Contractor. 8. All work to be competed at nights or weekends when the facility is not open. 9. All trash must be picked up and areas cleaned prior to building opening each day

Details

Division 09 - Finishes, Flooring, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents