Similar Projects
A-B Technical Community College Enka Campus TCC Building Roof Replacement
Alteration
Bidding
Candler, NC 28715

Hunt Hill Roof
Alteration
Bidding
Asheville, NC

Roofing MACC
Post-Bid

Roofing Repair and Maintenance
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Design Team for Exterior Remediation at A-B Tech
Alteration
Post-Bid
Candler, NC 28715

Enka Middle School Re-Roof Phase V
Results
Candler, NC 28715

Roofing Services and Repair
Post-Bid
Asheville, NC 28803

Candler Elementary School Roof Replacement
Results
Candler, NC 28715

Replace Roofing for Various Buildings
Alteration
Post-Bid
Asheville, NC

Avery's Creek Elementary School Roof Replacement
Results
Royal Pines, NC 28704

T.C. Roberson High School Roof Replacement Areas 33 and 37
Results
Asheville, NC 28803

Claxton Elementary School Reroof Project
Results
Asheville, NC 28801

Weaverville Primary School Roof Replacement Phase II - Area L
Results
Less than $500,000 est. value
Weaverville, NC 28787

Last Updated 11/01/2021 10:00 AM
Project Title

Public Works - Building A - Roof Replacement

Physical Address View project details and contacts
City, State (County) Asheville, NC   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roof Areas A1-A6: a. Remove and dispose of the existing roof system including flashings and sheet metal down to the existing lightweight insulating concrete. b. Full adhere felt-back thermoplastic polyolefin (TPO) membrane along with flashings and accessories as specified in Section 07 54 23 "Thermoplastic-Polyolefin Roofing". c. Replace sheet metal flashings and trim as specified in Section 07 62 00 "Sheet Metal Flashing and Trim" d. Provide a complete, watertight, 20-year warrantable roof assembly. 2. Roof Area B1: a. Remove and dispose of the existing roof system including flashings and sheet metal down to the existing insulation system to remain. b. Prepare existing low slope roof and provide steep slope retrofit framing to provide specified slope. c. Contractor shall be responsible to ensure retrofit framing and fasteners penetrating the roof system are installed in a watertight condition. d. Provide batt insulation over the existing roof system. e. Provide condensation control insulation and thermal spacers over zee purlin retrofit framing. f. Fully adhere metal roof panel underlayment. g. Provide standing seam metal roof panel system along with flashings, trim and accessories as specified in Section 07 41 13 "Metal Roof Panels". h. Provide a complete, weathertight, 20-year warrantable roof assembly with 30-year finish warranty. 3. Exterior Wall Restoration: a. Replace through wall flashings at masonry elevation wall above roof level as specified in Section 07 65 00 "Through Wall Flashing". 4. Skylight Restoration: Provide silicone dense rubber extrusion overlay at aluminum to glass joints and aluminum to aluminum joints.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents