Similar Projects
Removal and Replacement of Boiler, Oil Burner, Circulator Motor and Associated Piping and Insulation
Post-Bid
South Salem, NY 10590

Hot Water Heater (Leslie E900L)
Post-Bid
Less than $50,000 est. value
Comstock, NY 12821

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

Lansing Central School District - Reconstruction to Senior High School
Results
Lansing, NY

Hot Water Tanks Removal and Replacement
Post-Bid
Clifton Park, NY 12065

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Hood/Clean Room Certification and Air Flow Testing Services
Post-Bid
Valhalla, NY 10595

Preventive Maintenance Service for the Building Management System and Ancillary Equipment
Term Contract
Results
Orangeburg, NY 10962

Boiler Replacement - 74 Church Street
Post-Bid
Beacon, NY

Ship Arrestor HPU Installation Project
Results
$250,000 to $500,000 est. value
Massena, NY 13662

Operation and Maintenance of Copper-Silver Water Disinfection Systems
Term Contract
Post-Bid
Valhalla, NY 10595

Removal and Replacement of Fire, Flood, and H2S Systems
Results
$100,000 to $250,000 est. value
Dresden, NY 14441

Maintenance 8C Installation Boiler Repair
Post-Bid
Blauvelt, NY 10913

North Tonawanda CSD 2019 Capital Outlay - Mechanical Contract
Results
Less than $100,000 est. value
North Tonawanda, NY 14120

2020 - 2025 Furnace, Boiler and Hot Water Inspections, Start Up and/or Maintenance Service
Term Contract
Post-Bid

Last Updated 05/27/2021 09:00 AM
Project Title

Medical Library Steam Service Modifications

Physical Address View project details and contacts
City, State (County) Syracuse, NY   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: is to extend steam & condensate piping from Weiskotten Hall to the Medical Library, including brief service outages and tie-ins, to allow supply from the NAB boiler plant via the adjacent building, in place of district steam from Syracuse University. The operation of the new NAB boilers will provide the necessary steam capacity at a much lower operating cost.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Water Treatment, Water Treatment for Steam System Feedwater.
Division 40 - Process Integration, Steam Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents