Similar Projects
Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

Animas High School
New Construction
Conception
$21,000,000 est. value
Durango, CO 81301

CM/GC Services for 2021 Renovations at Three Sites
Renovation
Design
Colorado Springs, Thornton, CO

CM/GC Services for 2021 Renovations at Three Sites
Renovation
Design
Colorado Springs, Thornton, CO

CM/GC Services - New "K-8 School"
New Construction
Bidding
$30,000,000 est. value
Pueblo, CO 81003

Fort Collins High School CM/GC Services
New Construction
Bidding
$70,000 est. value
Fort Collins, CO 80525

East HS Elevator Modernization
Post-Bid
Denver, CO 80206

Notice Concerning Prequalification for Large Construction Projects
New Construction
Post-Bid
$100,000 est. value
Lakewood, CO 80215

Additions of Two New Sets of Rooms to the Existing Classroom Wing and Fieldhouse Wing
Addition
Results
Akron, CO 80720

Design/Build of New Greeley West High School
New Construction, Demolition
Results
$123,000,000 est. value
Greeley, CO 80631

Aspen View Academy
New Construction, Addition - 21,000 SF
Construction
$2,000,000 to $2,500,000 est. value
Castle Rock, CO

New Centennial High School and Pueblo East HS
New Construction
Construction
$75,700,000 est. value
Pueblo, CO 81008

September School at Saddle Creek Subdivision
Renovation
Pending Verification
Boulder, CO 80302

Reimagining Montbello
New Construction
Bidding
$88,000,000 est. value
Denver, CO 80239

Shaw Middle School Boiler and Controls Replacement
Post-Bid
Westminster, CO 80030

Reported 03/27/2021 12:00 AM
Project Title

Arapahoe High School General Upgrades

Physical Address View project details and contacts
City, State (County) Centennial, CO 80122   (Arapahoe County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Replacement of the Auditorium theatrical lighting and associated control equipment (dimming rack, luminaire connection receptacle, etc.) with a new LED performance lighting and control system. 2. Replacement of the existing Auditorium house lighting and associated controls. 3. Relocation of the Auditorium Sound and Lighting Control Booth from the back of Auditorium mezzanine area to a location on the Auditorium main floor. 4. Provide new projector control system and associated audio video system interface with lighting and sound controls. Contractors and consultants will be expected to cooperate with the District’s separate consultants and contractors, coordinating and planning details of all work through the District’s Program Management Consultant (Jacobs).

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents