Similar Projects
Last Updated | 09/02/2020 05:09 PM |
Project Title | Upgrade of Green Gap and Roy Lane Pump Stations |
Physical Address | View project details and contacts |
City, State (County) | Chattanooga, TN (Hamilton County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project entails upgrading two submersible duplex sewage pump stations owned and operated by the Hamilton County Water & Wastewater Treatment Authority (WWTA) and includes the following work elements at each station: Removal of the existing pumps and installation of two new owner-supplied pumps; modifications to existing control panel (at each station); installation of new flow meter manhole/vaults, removal/modifications to existing piping configuration and installation of new piping and fittings; miscellaneous electrical work; and other miscellaneous demolition tasks and improvements. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |