Similar Projects
J Avenue Filter Building Roof Replacement - City of Cedar Rapids
Renovation
Conception
$1,250,000 CJ est. value
Cedar Rapids, IA 52402

Nutrient Reduction Modifications - Phase 2 - City of Ames
New Construction, Infrastructure
Conception
$14,260,000 CJ est. value
Ames, IA 50010

Digester Complex Rehabilitation - V3151 - City of Iowa City
Renovation
Design
$10,621,000 CJ est. value
Iowa City, IA 52241

Cogeneration System Maintenance - City Of Ames
Renovation, Infrastructure
Design
$1,335,000 CJ est. value
Ames, IA 50010

Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Bidding
$2,077,275 CJ est. value
Cincinnati, IA 52549

Water Treatment Plant - Milford Municipal Utilities
Demolition, New Construction, Infrastructure
Bidding
$18,600,000 CJ est. value
Milford, IA 51351

Sanitary Sewer Improvements Division 1 Rebid
Infrastructure
Post-Bid
$350,000 CJ est. value
Randolph, IA 51649

Wastewater Improvements - 2022
Renovation, Infrastructure
Post-Bid
$690,000 CJ est. value
Le Mars, IA 51031

Earlham Lagoon Upgrades
Renovation
Results
$3,979,000 est. value
Earlham, IA 50072

WRF Aeration Basin Sensor Improvements
New Construction
Results
Less than $1,588,000 est. value
Des Moines, IA 50317

Wastewater Treatment Plant - City of Humboldt
New Construction, Infrastructure
Pending Verification
$3,400,000 CJ est. value
Humboldt, IA 50548

Rebuild J Avenue and NE Water Treatment Plant
Infrastructure, Build-out
Pending Verification
$83,900,000 CJ est. value
Cedar Rapids, IA 52401

Water & Resource Recovery Center - Boiler 2 - City of Dubuque
Renovation
Conception
$350,000 CJ est. value
Dubuque, IA 52003

Demolition of Old Water Treatment Plant & TSC Improvements - City of Ames
Demolition
Design
$1,141,000 CJ est. value
Ames, IA 50010

Wastewater Treatment Facility Improvements
Renovation
Bidding
$18,600,000 CJ est. value
Monticello, IA 52310

Last Updated 10/02/2023 06:05 PM
Project Title

WTP Automation and Control Upgrades, Phase 1

Physical Address View project details and contacts
City, State (County) Spirit Lake, IA 51360   (Dickinson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $932,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, and equipment necessary to replace multiple turbidity, pH, chlorine analyzer sensors and transmitters, insert mag meters (multiple sizes), SCADA radios, improvements to the existing SCADA system, new SCADA server, and added monitoring of five (5) standby generators, together with related subsidiary and incidental work in accordance with the plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents