Similar Projects
N Townsend Avenue Retail Development
New Construction, Infrastructure
Design
$2,479,611 CJ est. value
Montrose, CO 81401

CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2
Infrastructure
Design
$10,000,000 CJ est. value
Montrose, CO 81401

Montrose County Jail - Addition/Renovation Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Post-Bid
$4,900,000 CJ est. value
Montrose, CO 81401

6700 Road Extension Project
Infrastructure
Post-Bid
$291,300 CJ est. value
Montrose, CO 81401

Montrose Regional Health Ambulatory Care Center
New Construction, Infrastructure - 80,000 SF
Pending Verification
$43,000,000 CJ est. value
Montrose, CO 81401

Nucla Affordable Housing Development
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Nucla, CO 81424

South 3rd Plaza Construction
Infrastructure
Post-Bid
$1,973,608 CJ est. value
Montrose, CO 81401

Ridgway Water Treatment Plant - Project 7 Water Authority
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Montrose, CO 81401

RFP D/B - Project 7 Water Authority - Water Supply Resiliency Program - Water Treatment Plant (Package 1) and Waterline (Package 2)
Infrastructure
Post-Bid
$94,000,000 CJ est. value
Montrose, CO 81401

Trails at Cobble Creek
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Montrose, CO 81403

Montrose Regional Airport Construct Southern Public Parking Lot
Infrastructure
Post-Bid
$3,400,000 CJ est. value
Montrose, CO 81401

Fiori Di Lena
New Construction, Infrastructure
Pending Verification
$4,700,000 CJ est. value
Montrose, CO 81401

One Stop Shop / Montrose
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Montrose, CO 81403

Buckley Playground Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Montrose, CO 81401

Last Updated 12/08/2023 04:09 PM
Project Title

Butterfly Valve Replacement - Blue Mesa Powerplant

Physical Address View project details and contacts
City, State (County) Montrose, CO 81401   (Montrose County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Dam/Tunnel, Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Butterfly Valve Replacement - Blue Mesa Powerplant PRESOLICITATION SYNOPSIS NOTICE PURPOSE: The U.S. Bureau of Reclamation, Upper Colorado Basin, is seeking a Contractor to furnish the labor, materials, and equipment for the replacement of two 156-inch diameter butterfly valves and rehabilitation of two 84-inch diameter ring follower gates (RFG) within the Blue Mesa powerhouse, located at the Blue Mesa Powerplant approximately 30 miles east of Montrose, Colorado in Gunnison County. This requirement is being procured in accordance with Part 15 and Part 36 of the Federal Acquisition Regulations as a total small business set-aside. The Bureau of Reclamation intends to issue a competitive solicitation for this requirement and make an award to the firm that represents the best value to the Government. PROJECT DESCRIPTION: The principal components of the work are listed below: a) Removal and disposal of existing 156-inch diameter butterfly valves, hydraulic operating system, actuators, bypass piping and valves, electrical equipment, concrete pedestals, and appurtenances. b) Cutting existing steel penstocks and welding of new pipe spools for connection to new stainless-steel bypass piping and valves. This work includes coating/lining removal and coating/lining re-application. c) Supply and design of two reinforced concrete pedestals or re-use of existing reinforced concrete pedestals to adequately support and anchor turbine shutoff valves (TSVs) against normal operating loads, vibration, and earthquake. d) Supply and design of one 149-inch diameter ellipsoidal dished head. e) Supply, design, installation, and testing of two 156-inch diameter TSVs, actuators, pipe spools, and appurtenant equipment. f) Design, fabricate, and install two bypass line access platforms. Bypass line access platform to include ladder, platform, and guardrail. g) Supply, design, installation, and testing of one hydraulic operating system capable of operating two 156-inch diameter TSVs, actuators, and appurtenant equipment. h) Supply and installation of one 16-inch diameter stainless bypass piping and valves. This work includes cutting into existing steel penstocks and welding of new pipe spools for connection to new stainless-steel bypass piping and valves. An alternative bypass design may be submitted subject to government approval. i) Removal and rehabilitation of RFG hydraulic cylinders, leaf bulkheads, and leaf followers. This work includes coating/lining removal and re-application. j) Rehabilitation of concrete embedded portion of RFG. This work includes coating/lining removal and re-application. k) Removal and replacement of leaking components within the RFG and hydraulic power unit (HPU). This work includes coating application. l) Installation and testing of rehabilitated RFG hydraulic cylinders, leaf bulkheads, and leaf followers. m) Design and supply a minimum of one blind flange cover to be used in place of the RFG upper bonnet cover. n) Provide dewatering facilities as required to collect/divert fixed wheel gate water leakage. o) Contractor responsible for draining and filling hydraulic oil. (Government will dispose of oil.) p) Commissioning and startup. q) Perform testing of existing butterfly valves to determine flow coefficient (Cv). Cv testing to be witnessed by Government. NAICS AND SIZE STANDARD: The NAICS code for this project is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $39.5 million. COMPETITION: Solicitation 140R4021R0001 will be conducted as a total small business set-aside. The Government reserves the right to award with or without discussions. DISCLOSURE OF THE OF THE CONSTRUCTION PROJECT: The of this project is between $5,000,000 and 10,000,000. SOLICITATION RELEASE DATE: The release date for the final solicitation 140R4021R0001 is anticipated to be in January 2022. Interested parties are encouraged to monitor this announcement for updates and the release of the solicitation documents. The solicitation documents for this procurement will be accessible via https://sam.gov/ . It is, and will continue to be, all potential offeror's responsibility to monitor the sam.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be providing any other methods of information dissemination. SYSTEM FOR AWARD MANAGEMENT (SAM, www.sam.gov): The System for Award Management (SAM) is a Federal Government owned-and-operated FREE web site that consolidates the capabilities in Central Contractor Registration (CCR)/Federal Register (FedReg), Online Representations and Certifications Application (ORCA), and Excluded Parties List System (EPLS). Offerors must be successfully registered in SAM in order to be considered for a Government contract award. SITE : The Government intends to conduct a for interested vendors. Information regarding the will be included in the solicitation. POINT-OF-CONTACT FOR QUESTIONS: The contract specialist for this solicitation is Brandi Clark, email: brandiclark@usbr.gov. Any communications regarding this procurement must be made in writing and forwarded via email and must identify the solicitation number, company name, address, email address, phone number including area code, and point of contact. NOTE: THIS IS NOT A REQUEST FOR PROPOSAL (SOLICITATION), NOR IS IT A REQUEST FOR QUOTATION (RFQ). It is not to be construed as a commitment by the requesting party to issue a solicitation or ultimately award a contract. Responses will not be considered as proposals or quotes. No award will be made as a result of this Notice. The Government will NOT be responsible for any costs incurred by interested parties in responding to this Notice. This Sam.gov Notice is strictly for compliance with FAR Subpart 5.2. As a result of this Notice, the Government may issue a competitive solicitation; however, should such requirements materialize, no basis for claims against the Government shall arise as a result of a response to the Notice (e.g. use of such information as either part of its evaluation process or in developing specifications for any subsequent requirement). The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/22/2023 at 5:00 PM MT

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Soil Treatment, Soil Stabilization, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents