Reported | 03/24/2022 12:00 AM |
Project Title | General Construction Contract- Brooks Substation |
Physical Address | View project details and contacts |
City, State (County) | Marshall, MI (Calhoun County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The overall scope of this project consists of the construction of a new 138kV:12.5kV dual transformer electrical distribution substation. Construction will consist of all site preparation, installation of two 138kV circuit switchers, two 20/27/33 MVA power transformers, nine (9) 15kV breakers, six 138kV combination PT/CT’s for metering, two 15kV bus structures, all equipment foundations, conduit, fence and ground grid, plus a new control house, control panels, battery system, and all associated protective relaying as more fully depicted on the drawings and in the specifications. Distribution line construction (including conduit and cable installation) plus site restoration is included in this contract. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |