Similar Projects
Last Updated | 08/17/2023 12:33 AM |
Project Title | Replace Sewer Screening System - Chillicothe Correctional Center |
Physical Address | View project details and contacts |
City, State (County) | Chillicothe, MO 64601 (Livingston County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $628,818 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace Sewer Screening System - Chillicothe Correctional Center The Project consists of the replacement of the sewer screening system at the Chillicothe Correctional Center MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. MBE/WBE - 10.0% / 6.9% Furnish and install all miscellaneous metal work required for this project. Verify conditions and check measurements in the field for metals fabricated to fitjob conditions and assume responsibility for proper fitting together ofthe materials. Prepare surfaces and prime in compliance with Section 099000, Paints and Coatings. Paint anchors to be embedded in masonry with asphaltum. Where dissimilarmetals come into contact, apply alkali-resistant paint to more active metal or vinyl isolation gasket between metals. Where steel work contacts aluminum, apply two coats ofaluminum paint over shop coat. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |