Similar Projects
Northern Virginia Science Center
New Construction - 70,000 SF
Conception
$75,000,000 est. value
Dulles, VA 20101

New Flagship Museum
New Construction
Conception
$450,000,000 est. value
Fort Belvoir, VA

VMFA Virginia Museum of Fine Arts
Renovation, Addition - 200,000 SF
Design
$190,000,000 est. value
Richmond, VA 23220

Remodel JS Changing Gallery
Renovation
Bidding
Williamsburg, VA 23185

Franconia Governmental Center Redevelopment (PPE)
Renovation
Bidding
Alexandria, VA 22310

Z--FRSP Drainage & Waterproofing Ellwood
Renovation
Post-Bid
$25,000 to $100,000 est. value
Locust Grove, VA 22508

Manassas Museum
Renovation
Post-Bid
$2,500,000 est. value
Manassas, VA 20110

Construction Management at Risk Services for Northern Virginia Science Center
Results
$38,000,000 to $43,000,000 est. value
Dulles, VA 20166

Muscarelle Museum Renovation and Addition
Results
$30,000,000 est. value
Williamsburg, VA

National Army Museum
New Construction - 185,000 SF
Construction
$119,000,000 est. value
Fort Belvoir, VA 22060

Violet Bank Museum
Renovation
Construction
Colonial Heights, VA 23834

Children's Museum of Virginia Elevator Replacement
Renovation
Post-Bid
Portsmouth, VA 23704

Frontier Culture Museum of Virginia - Construct Crossing Gallery
New Construction, Renovation - 56,200 SF
Results
Less than $34,000,000 est. value
Staunton, VA

VMFA New Expansion and Renovation for CM@Risk
Renovation, Addition - 218,000 SF
Post-Bid
Richmond, VA 23220

Friendship Firehouse Museum Exterior Repairs
Renovation
Results
Alexandria, VA 22314

Reported 03/03/2022 12:00 AM
Project Title

Handicap Restroom Upgrades

Physical Address View project details and contacts
City, State (County) Richmond, VA 23221   (Richmond City County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is generally described as renovations to 30 toilet rooms including limited fixture replacements, door and hardware replacement, tile replacement, and new bathroom accessories. Plumbing and electrical revisions are also included in the project. The project is generally described as upgrading existing public and staff toilet rooms with waterless urinals, touchless faucets, and automatic door openers. The work also involves renovating one existing toilet/shower room to accommodate two private toilet/shower rooms.

Details

Museum, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents