Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

2021 Utility Lining Improvements Project
Infrastructure
Bidding
Sioux City, IA

Storm Water Discharge
Infrastructure
Bidding
Dubuque, IA 52003

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Ludland Drive Street Repair
Results
$64,079 est. value
Manchester, IA

West Des Moines Campus
New Construction - 320,000 SF
Construction
$50,000,000 est. value
Des Moines, IA 50312

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Kavanagh House
Renovation, Addition - 110,100 SF
Pending Verification
Des Moines, IA 50312

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Hamilton Drain Storm Water Improvements Phase 2
Infrastructure
Bidding
$6,840,000 est. value
Des Moines, IA 50313

128th Street and Hickman Road
Infrastructure
Post-Bid
Urbandale, IA 50322

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

Reported 09/24/2021 12:00 AM
Project Title

BCRC Detention & Support Parking Site Prep

Physical Address View project details and contacts
City, State (County) Johnston, IA   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Parking Garage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the BCRC DETENTION & SUPPORT PARKING SITE PREP including all materials, labor and equipment necessary for the installation of approximately: 134 LF of an 8'x4' box culvert, approximately 995 LF of RCP storm sewer, 6 storm sewer structures, approximately 50,000 CY of Class 10 Excavation, 945 tons of riprap, temporary seeding, and miscellaneous related work and appurtenances.

Details

Parking Garage, Build-Out.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents