Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

Block 34 Park Improvements Project
Infrastructure
Bidding
$135,000,000 CJ est. value
Stillwater, OK 74074

Cooling Tower Replacement
Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Cushing, OK 74023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Replacement of Sanitary Sewer Interceptors and Miscellaneous Wastewater Projects
Infrastructure
Results
$12,500,000 est. value
Stillwater, OK

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Energy Services Water Line Repairs
Term Contract
Construction
$250,000 CJ est. value
Stillwater, OK 74077

Dutch Bros / Stillwater
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Stillwater, OK 74074

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Full Conversion Crude Oil Refinery Development / Chicago
New Construction, Infrastructure
Pending Verification
$5,560,000,000 CJ est. value
Cushing, OK 74023

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

Recovered Water Pump Station and Finished Water Pump Station
Infrastructure
Bidding
$43,300,000 CJ est. value
Stillwater, OK 74075

Last Updated 09/02/2023 07:03 AM
Project Title

Cushing Municipal Authority Clarifier Vault Piping Replacement

Physical Address View project details and contacts
City, State (County) Cushing, OK 74023   (Payne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

WTP Valve and Piping Replacement Public Notes: Description of Project: Replacement and upgrade of two (2) 8-inch manually operated plug valves to electrically actuated plug valves; replace six (6) 3-inch globe valves with plug valves; and other electrical and piping as needed to complete the Project. PROJECT NUMBER: 435-237050-003-8180

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents