Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County
Infrastructure
Conception
$3,053,510 est. value
Broomfield, CO 80021

Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

Padre Pio Center of the New Evangelization
New Construction, Infrastructure - 4,707 SF
Design
$1,600,000 CJ est. value
Littleton, CO 80127

RFP Construction Manager - ITS Maintenance Yard - Arvada Project and Coal Creek Project CMGC
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Arvada, CO 80003

Ward TOD Streets/ Intersections
Infrastructure
Bidding
$700,000 CJ est. value
Wheat Ridge, CO 80033

Traffic Signal Replacement, Curb Ramps, Pavement Markings
Infrastructure
Sub-Bidding
$20,000,000 CJ est. value
Lakewood, CO 80226

Traffic Signal Replacement, Curb Ramps, Pavement Markings
Infrastructure
Sub-Bidding
$20,000,000 CJ est. value
Lakewood, CO 80226

Golden DDA Sidewalk and Alley Power Washing
Post-Bid
Golden, CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Ralston Road - Yukon Street to Garrison Street
Results
Arvada, CO 80001

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Construction
$20,000,000 CJ est. value
Broomfield, CO 80021

Rainbow Hill Road Hotel and Commercial
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Evergreen, CO 80439

Last Updated 08/16/2022 04:32 PM
Project Title

W 44th Avenue and McIntyre Street Intersection Improvements

Physical Address View project details and contacts
City, State (County) Golden, CO 80403   (Jefferson County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Jefferson County Project : 3-70-24-3964 CDOT Project no: 22277/SHE C110-044 The County of Jefferson, Colorado, by and through its Purchasing Manager, is accepting bids for the construction of traffic signal replacement, flatwork and asphalt overlay at W 44TH Avenue & McIntyre Street in accordance with the terms, conditions, and specifications contained in these bid documents. Jefferson County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The DBE goal for this project is 12% and the On-the-Job-Training (OJT) goal is zero hours. Prior to submitting a Bid Proposal for this project, the Bidder shall have received prequalification status (active status) with the Colorado Department of Transportation to bid on individual projects of this size and kind of work as set forth in these documents. An EEO-1 Report must be submitted to the Joint Reporting Committee if the contractor and subcontractors meet the eligibility requirements (29CFR1602.7). For additional information regarding these federal requirements, please refer to: http://www.eeoc.gov/employers/eeo1 survey/faq.cfm. Buyers Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Question Acceptance Deadline 06/09/2022 01:00 PM EDT Questions are submitted online No

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents