Similar Projects
Hull Street Improvements Phase III:: Warwick Road To Arizona Drive(Federal) - City Of Richmond
Infrastructure
Conception
$11,664,000 CJ est. value
Richmond, VA 23225

Hull Street Improvements Phase III:: Warwick Road To Arizona Drive(Federal) - City Of Richmond
Infrastructure
Conception
$11,664,000 CJ est. value
Richmond, VA 23225

Y1lz--Women's Health Clinic Parking Access
Alteration
Design
$500,000 to $1,000,000 est. value
Richmond, VA 23249

Dabbs House Road Residences (Carter Woods Phase 3)
New Construction, Infrastructure - 6,000 SF
Design
$36,000,000 CJ est. value
Richmond, VA 23223

507E Improvements for Whole Health
Term Contract, Build-out, Infrastructure
Bidding
$100,000 CJ est. value
Richmond, VA 23249

Richmond Water Treatment Plant Raw Water Screening Facilities
Demolition, New Construction, Renovation, Infrastructure
Bidding
$7,500,000 CJ est. value
Richmond, VA 23221

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Creighton Court Redevelopment
Demolition, New Construction, Infrastructure
Construction
$245,000,000 CJ est. value
Richmond, VA 23223

Martin Agency Offices - Rooftop Terrace & Interior Renovations
Addition, Demolition, Renovation, Infrastructure - 7,000 SF
Pending Verification
$5,000,000 CJ est. value
Richmond, VA 23219

Brookland Park Apartments
New Construction, Infrastructure - 3,670 SF
Pending Verification
$17,000,000 CJ est. value
Richmond, VA 23222

Fall Line Trail - Longdale Phase - Henrico County
Infrastructure
Design
$200,000 est. value
Richmond, VA

Citywide Transit Stop Access Improvements
Infrastructure
Bidding
$826,823 CJ est. value
Richmond, VA 23219

Last Updated 09/06/2022 04:04 AM
Project Title

Highland Grove/Dove Street Redevelopment - 104910 - City of Richmond

Physical Address View project details and contacts
City, State (County) Richmond, VA 23222   (Richmond City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,383,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will allow funding for RRHAs development of the former Dove Street Redevelopment Area for associated infrastructure improvements to support construction of 139 residential units. Project will be constructed in five Phases (Phase I- 33 units Phase II- 15 units Phase III- 45 units Phase IV-27 units Phase V-19 units). The infrastructure project includes planning, design, and improvements to right-of-way, streets, sidewalks, landscaping, streetscape and ornamental lighting, water and sewer and connection fees, and other utilities that will be designed and constructed by RRHA and approved by the City of Richmond. This project is in included in the City's or County's FY 2023 - 2027 Capital Improvement Plan (CIP). As of September 06, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents