Similar Projects
20th Street Culvert Replacement
Infrastructure
Bidding
$3,000,000 CJ est. value
Sault Sainte Marie, MI 49783

Sault Ste Marie High School Remodel
Renovation
Post-Bid
Sault Sainte Marie, MI 49783

2 Elem School Remote/Portable Classrooms
Renovation
Post-Bid

2019 School Bond Projects Redesign
Renovation
Results
Pickford, MI

2019 School Bond Projects Redesign
Renovation
Results
Pickford, MI

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Brimley, MI 49715

Eastern Upper Peninsula Intermediate School District, Learning Center
Renovation
Post-Bid
Sault Sainte Marie, MI

Drummond Island-Phase II- Drummond Island Elementary
Renovation
Results
De Tour Village, MI

Chippewa County International Airport - Rehabilitate Taxiway A
Infrastructure
Pending Verification
$1,054,039 CJ est. value
Kinross Charter Township, MI 49788

Flat Rock Esser Funds 2022 Project
Renovation
Post-Bid

Whitefish Township Community Schools 2021 Improvements
Renovation
Results
Paradise, MI

Detour Park Improvements
Renovation
Post-Bid
De Tour Village, MI

Greenhouse Addition
Addition
Results
Rudyard, MI 49780

Demolition and Disposal ofExisting Rooms, and Remodel ofTwo (2) Cisler Center Guest Rooms, with Option of Splitting the Existing Two (2) Rooms into Three (3) Guest Rooms
Demolition, Build-out, Infrastructure
Post-Bid
$24,688 CJ est. value
Sault Sainte Marie, MI 49783

Last Updated 03/22/2023 06:09 AM
Project Title

Rudyard Area Schools Track Reconstruction

Physical Address View project details and contacts
City, State (County) Rudyard, MI 49780   (Chippewa County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $369,450 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is given hereby that Rudyard Area Schools will accept bids from qualified contractors for renovations to: Track Reconstruction Project according to Drawings and Specifications prepared by: Integrated Designs Inc. 1021 West Baraga Avenue Marquette, MI 49855 This work includes, but is not limited to: Removal of the existing running track. and associated field event areas. Construction of a new 6-lane running track with field event areas (long jump, pole vault, high jump, discus and shot put). Other items of work include: fencing, storm sewer installation and turf restoration. There will not be a pre-bid conference meeting for this project. Please contact the Engineer (Andrew Mansfield, P,E. with any questions regarding this project at (906) 228-4480. Bids will be taken on a lump sum basis as defined on the Bid Form. Bids shall be accompanied by bid security equal to 5% of the bid amount. 100% Surety Bonds for performance and payment of labor and materials are required. Bonds must be submitted on the forms provided. No alteration(s) to the form will be accepted. The Owner reserves the right to reject any or all bids and to waive irregularity in the bidding or the bidding process and accept the bid that is most advantageous to the Owner THE PROPOSED PROJECT CONSISTS OF REMOVAL OF THE EXISTING RUNNING TRACK AND FIELD EVENT AREAS. CONSTRUCTION OF A NEW 400 METER RUNNING TRACK AND ASSOCIATED FIELD EVENT AREAS.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents