Similar Projects
Otech Chiller Replacement Project
Alteration
Bidding
$200,000 est. value
Kissimmee, FL 34744

Boiler and Water Heater Maintenance and Repairs
Alteration
Bidding
$75,000 est. value
Miami, FL 33166

Replacement of Existing McQuay Chiller at Pensacola Downtown Public Library
Post-Bid
Pensacola, FL

Mechanical Insulation Services
Post-Bid
FL

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Water Treatment for Cooling Towers and Closed Loop Systems
Term Contract
Results
Kissimmee, FL 34744

Deerhaven Chiller
Alteration
Bidding
Gainesville, FL 32653

Repairs to Degasifer Unit
Post-Bid
Miramar, FL

Cooling Tower Water Treatment Services at the McIntosh Power Plant
Term Contract
Results
Lakeland, FL 33805

Internal Operations Center I Chiller Replacement
Alteration
Bidding
$81,500 est. value
Orlando, FL 32801

Garage Elevator Repair State #43161 Halifax Health Daytona Beach Campus
Renovation
Post-Bid
Daytona Beach, FL 32116

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Buckingham Scale Replacement
Term Contract
Bidding
Fort Myers, FL 33905

PHCD Boiler Inspections Preventive Maintenance and Repair Services Parts
Post-Bid
$80,000 est. value
Miami, FL 33138

Camelot WRF Aeration Grit Removal
Results
Kissimmee, FL 34746

Last Updated 04/15/2022 01:26 PM
Project Title

Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Overview: This project will replace deteriorated domestic water shutoff valves in the over fifty year old main building (Building 1) in the Malcom Randall VA Medical Center Gainesville to improve the ability to isolate sections of the existing domestic (potable) system to aid in maintenance of the system, enhance water quality, maintenance accessibility, and perform remedial operations. Additionally, shutoff valves and injection ports for chlorination are to be added to isolate smaller areas of the system for pneumophila and non- pneumophila remediation actions to minimize the impact to the facility when remedial actions are required. During the process of replacing the valves, replace pipes connected to the valves to the next pipe joint or direction change. Also, some valves are located above ceilings and other utilities, which will have to be temporarily removed to do the work. The D/B Team staff performing the piping replacement/valve replacement work shall be press-connect certified when installing press-connect fittings and have demonstrable experience. Manufacturer certification with the type of press-connect fittings being installed is required. Access panels in accordance with specified requirements are to be provided to permit future access to the valves or injection ports. The contractor to coordinate the shutdowns and minimize or eliminate the effect on hospital operations that must remain in service during regular working hours.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents