Last Updated | 12/01/2022 02:06 AM |
Project Title | OMH Kingsboro Psychiatric Center Buildings 2 and 28 Interior Renovations and HAZMAT Abatement |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 11203 (Kings County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $23,499,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of October 17, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Contract term: November 8, 2024 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 18% Women Owned Sub-Contracting Goal: 12% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Interior renovations in Buildings 2 & 28. Full gut rehab of existing bathrooms with new finishes and ligature resistant mechanical, electrical, plumbing, and fire protection fixtures and devices. Building 28 also includes the demolition of the lower-level bathroom floor for relocation of under slab plumbing, new concrete floor slab on grade, radiant ceiling panel heaters, and exhaust fans. Building 2 - finishes throughout all patient spaces will be replaced with new paint, floors, corner guards, chair rails, wainscot protection, and rubber base. In patient areas excluding the bedrooms, ceilings will be replaced with secure metal panel ceilings with ligature resistant mechanical, electrical, plumbing, and fire protection devices. In non-patient areas, existing finishes will be updated with new paint, replacement of ACT ceilings with new ACT ceilings and MEP devices, flooring, and rubber base. Existing med room, office, and nurse's station will be demolished and replaced with a combination charting and med room with a new nurse's station. Existing living unit entry vestibules will be enlarged. Existing wood doors and select hollow metal frames will be replaced with new doors, frames, and hardware. Select existing mechanical fans will be repaired or replaced as noted in the testing and balancing report conducted for building 2 and full ductwork cleaning shall be performed. All signage shall be removed and replaced with new ligature resistant signs. Select millwork will be replaced in exam and staff break rooms. This project will be phased with a fully occupied facility at building 2. Coordination to occur between the owner, facility, construction manager, and contractor. Estimated construction cost: $21,650,000 - $22,350,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |