Similar Projects
Last Updated | 01/27/2022 06:00 PM |
Project Title | Airport Substation Power Control Assembly |
Physical Address | View project details and contacts |
City, State (County) | Loveland, CO (Larimer County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Electric Substation |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This specification describes the requirements to design, furnish, and deliver a prefabricated, factory-finish coated, metal building with floor. The building will be provided in accordance with this Specification as described below and in accordance with the control building floor plan drawing as specified on the purchase requisition. 1.2 Work Included A. Equipment specified herein, including: 1. Equipment, materials, and documentation specified herein, 2. Medium Voltage Switchgear, as specified in Section 261326, 3. AC and DC power equipment, 4. Heating, Ventilating, and Air Conditioning (HVAC) equipment, 5. Equipment design, 6. Cleaning, painting, and coating, 7. Shop assembly and wiring, 8. Factory testing and test reports, 9. Packing for transport, 10. Shipping FOB jobsite, 11. Unloading and setting on foundation, 12. Field installation and assembly, 13. All material, equipment, accessories, and testing specified or indicated on attached drawings. |
||||||||||||
Details | Electric Substation, New Construction.
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |