Similar Projects
Beaver Creek Substation And Cheyenne Substation Breaker Replacements
Renovation
Bidding
Avon, CO - Cheyenne, WY 81620

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Design-Build of "Eastside" Distribution Substation
Term Contract
Construction
Fountain, CO 80817

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

SEP Horizon Three Phase Variable Shunt Reactor
New Construction
Post-Bid
Colorado Springs, CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

Shunt Reactor for Hayden Substation
Term Contract
Post-Bid
Hayden, CO

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

CMAFS Substation
Renovation
Post-Bid
Colorado Springs, CO 80926

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Transformer T3 Replacement Timberline Substation
Renovation
Post-Bid
Fort Collins, CO

Poncha Substation Stage 04
Results
$500,000 to $1,000,000 est. value
Poncha Springs, CO

Last Updated 01/27/2022 06:00 PM
Project Title

Airport Substation Power Control Assembly

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This specification describes the requirements to design, furnish, and deliver a prefabricated, factory-finish coated, metal building with floor. The building will be provided in accordance with this Specification as described below and in accordance with the control building floor plan drawing as specified on the purchase requisition. 1.2 Work Included A. Equipment specified herein, including: 1. Equipment, materials, and documentation specified herein, 2. Medium Voltage Switchgear, as specified in Section 261326, 3. AC and DC power equipment, 4. Heating, Ventilating, and Air Conditioning (HVAC) equipment, 5. Equipment design, 6. Cleaning, painting, and coating, 7. Shop assembly and wiring, 8. Factory testing and test reports, 9. Packing for transport, 10. Shipping FOB jobsite, 11. Unloading and setting on foundation, 12. Field installation and assembly, 13. All material, equipment, accessories, and testing specified or indicated on attached drawings.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents