Similar Projects
Last Updated | 10/16/2023 12:32 PM |
Project Title | 2023 Roof Replacements for the Wastewater Treatment Plant |
Physical Address | View project details and contacts |
City, State (County) | Lansing, MI 48917 (Eaton County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $457,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Lansing encourages proposals from All Vendors Including MBE/WBE Vendors and Lansing-Based Businesses. The city of Lansing is addressing critical roofing needs located throughout the wastewater treatment. Projects included in the bid package consist of full tear off and replacements of existing ballasted EPDM roof systems.. The following pages give drawings and details outlining the scope of work for each project as a supplement to the specifications. Tank Replacement will be taking place in the South Chemical Building and Sodium Hypochlorite Storage Building. The contractor will be responsible for coordinating with other trades for timing of these roofs to coincide with the tank replacement, which requires removal through the roof. A. The Project is located at the WWTP, 1625 Sunset Ave., in the City of Lansing, Michigan. B. The work consists of the removal of approximately 17,000 square feet of existing ballasted EPDM and flood and gravel built up roof, at 4 different buildings, and installation of a new SBS modified roofing system. The existing roof decks are concrete, some have slope and other are flat. All concrete decks will receive a torch applied vapor barrier. All roofs will receive a minimum 5.2" of polyiso insulation. Tapered insulation or crickets will be used to get appropriate drainage to sumped internal drains. A 1/2 " gypsum cover board will be adhered to the insulation prior to installation of the membrane system. All new coping, edge, and counterflashing metal shall meet ANSI-SPRI ES-1 standards. C. Grade and seed lawn areas disturbed by the work. If you have any questions please contact Stephanie Robinson, Senior Buyer, at (517) 483-4128 or email: Technical questions should be directed to Bill Brunner @ (517) 483-4018 Every request for interpretation shall be made in writing to the City of Lansing Purchasing Office. Only those written inquires received fourteen (14) or more days prior to the date fixed for the opening of Bids will receive a response. The location of the proposed construction for the project known as B/23/015, will be located at: SOUTH BLOWER SOUTH CHEMICAL EAST BLOWER HYPO-CHLORITE LANSING WASTEWATER TREATMENT PLANT 1625 SUNSET AVE., LANSING MI |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |