Similar Projects
All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

Food Bank of the Hudson Valley Distribution Facility
New Construction, Infrastructure - 40,000 SF
Conception
$10,700,000 CJ est. value
Montgomery, NY 12549

Sunrise Commons/ Tivoli Plaza
New Construction, Infrastructure - 56,100 SF
Design
$35,000,000 CJ est. value
Goshen, NY 10924

The Milk Factory
Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Walden, NY 12586

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - Design-Build Services for the Moodna Viaduct Timber Bridge Ties Replacement
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Salisbury Mills, NY 12577

FCI Otisville - Medium Temperature Hot Water Line Replacement
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Otisville, NY 10963

Colden Park Phase Two Watermain Replacement
Infrastructure
Results
Newburgh, NY

FRC Farrell Shopping Center
New Construction, Infrastructure
Construction
$6,500,000 CJ est. value
Middletown, NY 10940

Phase 1 - 2022 Pike Street Sidewalk Replacement Project
Infrastructure
Construction
$203,400 CJ est. value
Port Jervis, NY 12771

Gardner Ridge Apartments
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Newburgh, NY 12550

Empire Properties Commercial Building
New Construction, Infrastructure - 18,000 SF
Pending Verification
New Windsor, NY 12553

Warriner Plumbing and Heating
New Construction, Infrastructure - 51,400 SF
Conception
$6,000,000 CJ est. value
New Windsor, NY 12553

Unity Place Warehouse
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Newburgh, NY 12550

Remediation and Purchase
Renovation, Infrastructure
Post-Bid
$123,250 CJ est. value
Newburgh, NY 12550

Last Updated 05/22/2023 11:33 AM
Project Title

Valley View Center for Nursing Care and Rehabilitation Total Trihalomethane Removal System for Drinking Water

Physical Address View project details and contacts
City, State (County) Goshen, NY 10924   (Orange County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Assisted Living Facility, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

No award unsure if/when project will rebid at this time. All questions about the meaning or intent of the Bid Documents may be submitted until 5:00 p.m. on Wednesday, March 29, 2023. Questions submitted prior to this deadline shall be responded to through the Addendum process. Questions submitted after the deadline shall receive no response. Submit questions in writing on company letterhead with date of question and contact information (name, fax, email, and phone number of person asking question) to: generalservices@orangecountygov.com. The Valley View Water Trihalomethane Removal project consists of the removal and disposal of two (2) existing water softening tanks and their replacement with two (2) new high pressure fiberglass reinforced plastic tanks, the charging of those tanks with new, vapor phase granular activated carbon, the fabrication of a schedule 80 PVC valve tree system complete with manually and electrically actuated valves, and the connection of this new valve tree system to the existing water supply piping from the village of Florida, the connection of the new valve tree system to the new fiberglass reinforced plastic carbon tanks, the connection of the new valve tree system to the existing exterior discharge manhole for the discharge of carbon backflush water, and the connection of the new valve tree system to the existing clearwell inside the building for the discharge of the processed water after treatment by the vapor phase activated carbon to remove the trihalomethanes The Contractor will be responsible for providing all labor, materials, supplies, tools, electric power, construction equipment, and all other facilities, services and permits necessary for the proper execution and construction of Work. -Included in this Work shall be acquiring all Work permits from local, state or. federal agencies, having underground utilities located and marked, excavation, backfill, installation of all water supply and discharge piping, valves, actuators, controls and sensors, electrical and instrumentation wiring, all required and necessary testing and disinfection of installed equipment and piping, and restoration of all disturbed areas as called for in these Specifications. Prior to beginning of Work, Contractor shall contact the Architect to verify limits of Work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents