Project Title | Valley View Center for Nursing Care and Rehabilitation Total Trihalomethane Removal System for Drinking Water |
Physical Address | View project details and contacts |
City, State (County) | Goshen, NY 10924 (Orange County) |
Category(s) | Heavy and Highway, Residential, Sewer and Water |
Sub-Category(s) | Assisted Living Facility, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | No award unsure if/when project will rebid at this time. All questions about the meaning or intent of the Bid Documents may be submitted until 5:00 p.m. on Wednesday, March 29, 2023. Questions submitted prior to this deadline shall be responded to through the Addendum process. Questions submitted after the deadline shall receive no response. Submit questions in writing on company letterhead with date of question and contact information (name, fax, email, and phone number of person asking question) to: generalservices@orangecountygov.com. The Valley View Water Trihalomethane Removal project consists of the removal and disposal of two (2) existing water softening tanks and their replacement with two (2) new high pressure fiberglass reinforced plastic tanks, the charging of those tanks with new, vapor phase granular activated carbon, the fabrication of a schedule 80 PVC valve tree system complete with manually and electrically actuated valves, and the connection of this new valve tree system to the existing water supply piping from the village of Florida, the connection of the new valve tree system to the new fiberglass reinforced plastic carbon tanks, the connection of the new valve tree system to the existing exterior discharge manhole for the discharge of carbon backflush water, and the connection of the new valve tree system to the existing clearwell inside the building for the discharge of the processed water after treatment by the vapor phase activated carbon to remove the trihalomethanes The Contractor will be responsible for providing all labor, materials, supplies, tools, electric power, construction equipment, and all other facilities, services and permits necessary for the proper execution and construction of Work. -Included in this Work shall be acquiring all Work permits from local, state or. federal agencies, having underground utilities located and marked, excavation, backfill, installation of all water supply and discharge piping, valves, actuators, controls and sensors, electrical and instrumentation wiring, all required and necessary testing and disinfection of installed equipment and piping, and restoration of all disturbed areas as called for in these Specifications. Prior to beginning of Work, Contractor shall contact the Architect to verify limits of Work. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |