Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

Install Cured In Place Pipe Lining in Second Floor Sewer Piping, Federal Building/PO/CH
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Pierre, SD 57501

Install Cured In Place Pipe Lining in Second Floor Sewer Piping, Federal Building/PO/CH
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Pierre, SD 57501

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Black Hills Drive Extension
Infrastructure
Results
$500,000 est. value
SD

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

T.F. Riggs High School Athletics Addition - Pierre School District
Addition, Demolition, Infrastructure
Pending Verification
$9,300,000 CJ est. value
Pierre, SD 57501

OAHA YMCA Phase 2 Addition
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$500,000 CJ est. value
Pierre, SD 57501

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

RFP Design - Architectural and Engineering Services Grounds ,Stormwater,Water Line,Sewer
Infrastructure
Post-Bid
$3,200,000 CJ est. value
Pierre, SD 57501

Access Area Construction, Whitewood Lake Access Area
Infrastructure
Results
$400,000 est. value
Pierre, SD

Last Updated 02/07/2023 12:07 AM
Project Title

Pickle Ball Courts

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Griffin Park Drive, Griffin Park, City of Pierre, SD. Project Category Code: Plumbing, Drainage, Parks, Recreation, Athletic & Aquatic Facilities, Tree Cutting, Concrete Walkway, Concrete Pavement, Fencing/Guardrails/Handrails, Grade and Surface, Excavation, Erosion Control - Temporary, Electrical Description: Construct 4 Pickle Ball Courts in the City of Pierre.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents