Similar Projects
Parking Lot at Saraland High School
Infrastructure
Bidding
Saraland, AL 36571

Parking Lot Phase 1 - Children's and Women's Hospital Pediatric Emergency Department
Infrastructure
Bidding
Mobile, AL 36604

Ladd-Peebles Stadium - Walking Trail
Post-Bid
Mobile, AL 36604

MOWA Choctaw Housing Authority Park and Walking Trail
Post-Bid
Mount Vernon, AL 36560

Sidewalk along Old Shell Road
Results
Less than $200,000 est. value
Mobile, AL

Sidewalks along Old Shell Road (Parkway Drive West to University Boulevard)
Results
Less than $323,759 est. value
Mobile, AL 36633

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Delta Port Parking Lot and Shoreline Improvements
Post-Bid
Dauphin Island, AL

2021 Annual Contract for Street and Sidewalk Repairs
Results
Less than $2,300,000 est. value
Mobile, AL 36618

Ann Street Rehabilitation
Post-Bid
Mobile, AL 36628

New Parking Lot for Mobile Community Corrections Building
Results
Less than $481,418 est. value
Mobile, AL 36603

Dauphin Island Repairs to West End Beach
Post-Bid
Dauphin Island, AL 36528

Old Shell TAP Sidewalk from Union Avenue to Hyland Avenue
Results
Mobile, AL 36607

Texas Street Infrastructure Rehabilitation
Post-Bid
Mobile, AL 36628

Copeland-Cox Tennis Center - ADA Improvements
Results
Mobile, AL 36608

Reported 11/23/2021 12:00 AM
Project Title

Whistler Street Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Prichard, AL 36610   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $158,650 to $193,895
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide the residents of Prichard and guest with American with Disabilities (ADA) Compliant sidewalks and curb ramps; curbs, and minor drainage improvements along the Whistler Historic District. the project limits are from the Whistler bike trail on North Anderson Avenue to Whistler Street terminating at Greer Avenue. The new sidewalk will be installed on one side of Whistler Street alternating sides, as necessary. The bracket estimate on this project is from $129,172.50 to $174,762.80. The principal items of work are approximately as follows: 1. Concrete Sidewalk, 4 Inch Thick 3093 SY 2. Concrete Curb, Type A 3644 LF 3. 18 Inch Storm Drain Pipe 310 LF 4. Concrete Driveway, 6 Inch 1010 SY 5. Curb ADA Ramps (included under sidewalk) 6. Detectable Warnings (included under sidewalk).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents