Similar Projects
Pine Ridge Joint Repair
Infrastructure
Bidding
Fraser, MI

Green Infrastructure Retrofits for Center Line DDA Parking Lot
Post-Bid
Less than $350,000 est. value
Center Line, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Shelden Trails Development and Construction (Phase 1)
Results
Less than $223,481 est. value
Shelby Township, MI 48316

Fire Station No. 3 Parking Improvements
Results
Clinton Township, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

City Hall Parking Lot Reconstruction
Results
Saint Clair Shores, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

2020 Sidewalk Repair Program
Results
Saint Clair Shores, MI

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

2020 Pathway Gap Closure Program
Results
Macomb, MI 48042

Bundle 3 Rest Area Ada Eastern Lower Peninsula - Interior
Post-Bid

2020 Sidewalk Repair Program
Results
Saint Clair Shores, MI 48081

Parking Lot Seam Repair
Infrastructure
Post-Bid
Clinton Township, MI 48036

Boat Launch Parking Lot Reconstruction
Results
MI

Last Updated 07/26/2021 09:33 AM
Project Title

Sidewalk Rehabilitation Program - 2020 CDBG

Physical Address View project details and contacts
City, State (County) New Haven, MI 48048   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the rehabilitation of various existing sidewalks, approximately: Remove Existing Concrete Sidewalk and Aggregate Base 2300 SY, 4" Concrete Sidewalk (5’ Wide) 2650 SY, 6" Concrete Sidewalk (5’ Wide) 435 SY, 21AA Limestone Aggregate Base 4” (CIP) 3,075 SY. In addition to ADA Ramps, Traffic Control and Maintenance, Maintenance Gravel, clean-up and restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents