Similar Projects
51 - Airport Asphalt Pavement Repair - 390-2664 - City of Dubuque
Infrastructure
Conception
$325,000 est. value
Dubuque, IA 52003

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Heritage Trail Peru Road Bank Stabilization
Infrastructure
Bidding
$350,000 CJ est. value
Dubuque, IA 52001

Heritage Trail Peru Road Bank Stabilization
Infrastructure
Bidding
$350,000 CJ est. value
Dubuque, IA 52001

Bridge Cleaning
Infrastructure
Post-Bid

2022 Bowstring Wildlife Area Streambank Stabilization
Infrastructure
Post-Bid
Bernard, IA 52032

Clover Lane Overlay
Results
Asbury, IA

Purina Drive Flood Wall Replacement
Results
$120,300 est. value
Dubuque, IA

Five Flags Building Improvements - City of Dubuque
Renovation, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Dubuque, IA 52001

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Dyersville East Road Utilities Extension 2022 Sanitary Sewer and Force Main
Infrastructure
Bidding
$200,000 CJ est. value
Dyersville, IA 52040

HMA Resurfacing and Culvert Replacements on Flannagan Road and James Road
Infrastructure
Post-Bid
$300,000 est. value
Balltown, IA 52073

Dubuque Co Mines of Spain Roadway Patching
Infrastructure
Results
$110,000 est. value
IA

North Cascade Road Reconstruction - City of Dubuque
Infrastructure
Conception
$1,200,000 est. value
Dubuque, IA 52099

Last Updated 09/20/2022 11:34 PM
Project Title

HMA Resurfacing, Culverts New-Single Box on Goose Hill Road Project

Physical Address View project details and contacts
City, State (County) Cascade, IA 52033   (Dubuque County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $4,055,492 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

HMA Resurfacing,Culverts New-Single Box on Goose Hill Road Project A certified check or a cashier's check made payable to either Dubuque County or the Contractor, drawn upon a solvent bank, or a bid bond or proposal guarantee in an amount set forth in the proposal form, shall be filed with each proposal. A cashier's check, made payable to the Contractor, shall contain an unqualified endorsement to Dubuque County, signed by the Contractor or an authorized agent of the Contractor. If a contractor is awarded the contract, the Contractor shall file with Dubuque County an additional bond in the amount of not less than 100 percent of the contract sum securing the performance of the contract within 15 days of approval or awarding of the contract. Failure to execute that contract, file the second bond, or a certificate of insurance within 15 days of the date of the approval for the awarding of the contract as herein provided, will be just and sufficient cause for the denial of the award and forfeiture of the proposal guarantee. All proposals must be filed on the forms furnished by Dubuque County, sealed and plainly marked. Proposals containing any reservations not provided for in the forms furnished may be rejected, and the County Board reserves the right to waive technicalities and to reject any or all proposals. Proposal forms may be seen and secured at the office of the County Engineer or County Auditor. HMA Resurfacing, RCB Culverts New-Single Box on Goose Hill Rd from Hwy 136 west 6.05 miles and on Recker Rd from Goose Hill Rd north 1.30 miles

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents