Similar Projects
CDBG Sidewalk Improvements
Post-Bid
North Charleston, SC 29419

Pedestrian Path - West 2nd Street
Post-Bid
Folly Beach, SC

On-Call Trip Hazard Repair-Chalreston
Term Contract
Results
SC

Orleans Road Sidewalk Installation TST
Results
Saint Andrews, SC 29407

Lighthouse Boulevard Sidewalk Project TST
Post-Bid
Charleston, SC 29412

On-Call Sidewalk Repair Clarendon Cty
Term Contract
Results
SC

IOP Connector to Palm Boulevard Sidewalk Installation
Results
North Charleston, SC

Zucker GEC Parking Lot - Resurface
Results
$103,318 est. value
North Charleston, SC 29634

St. Julian Devine Community Center Site Improvements
Results
Less than $399,557 est. value
Charleston, SC 29403

Northside Drive Sidewalk Project CTC
Results
North Charleston, SC 29405

Oakbrook Middle School Bus Parking Lot
Results
$150,000 to $250,000 est. value
Ladson, SC 29456

Kelly House Exterior Walkway Structural Repairs
Results
$685,000 to $835,000 est. value
Charleston, SC 29424

Beach Access Walkover Replacement
Results
Less than $34,160 est. value
Folly Beach, SC 29439

Building 401 Parking Lot Repaving
Results
Charleston, SC 29413

Dills Bluff Road Sidewalk
Results
Charleston, SC 29412

Reported 01/23/2020 12:00 AM
Project Title

Bay Creek Park Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Edisto Island, SC 29438   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $15,000 to $30,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To repair and improve the Bay Creek Park parking lot at 3706 Dock Site Rd, Edisto Beach, SC 29438. This would include but is not limited to, removing parking lot bumpers, regrade 1,460 sy of parking area, install 2” slag fines over existing 57 slag, grade and compact material. Finished parking lot should be permeable and packed in order to allow ease of walking and ADA compliant.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents