Last Updated | 06/12/2023 02:03 PM |
Project Title | Block 4A/4B Navajo-gallup Water Supply Project |
Physical Address | View project details and contacts |
City, State (County) | Gallup, NM 87301 (McKinley County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $66,772,171 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Mar 22, 2023 Contract Award Number: 140R4023C0005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NEEXAJK6X7H4 Contractor Awarded Name: S.J. LOUIS CONSTRUCTION, INC. Contractor Awarded Address: COLD SPRING MN 56320-4802 US Base and All Options Value (Total Contract Value): $66,772,171.90 1695-529-60185 The North American Industry Classification System (NAICS) code for this acquisition is 237110, small business size standard is $39.5M. Per the Reclamation Acquisition Regulation (RAR) - WBR 1436.204 - Disclosure of Magnitude - the estimated magnitude of construction is: (c) Between $50,000,000 and $100,000,000. NGWSP Block 4a & 4b: The principal components of work for Block 4a &4b include, but are not limited to, the following: 1. Approximately 18-miles of 42-inch buried water transmission pipe. 2. Valves, air valves, and blowoffs. 3. Wash crossings. 4. Jack and bore crossings. 5. HDD crossings. 6. Precast manhole structures. 7. Concrete thrust collars. 8. Concrete blocked miter bends. 9. Concrete encased miter bends. 10. Buried manholes. 11. Road crossings. 12. Utility crossings. 13. Erosion control. 14. Corrosion Protection. LOCATION OF THE WORK: Reach 4A: 7-mile pipeline and appurtenances, beginning 7.5-miles southeast of Shiprock, New Mexico at Proposed San Juan Lateral Water Treatment Plant, off N-36, extending south 7-miles to Proposed San Juan Lateral Pumping Plant No.2. Reach 4B: 10.9-mile pipeline and appurtenances, beginning 12-miles south of Shiprock, New Mexico at Proposed San Juan Lateral Pumping Plant No. 2, extending south to Proposed San Juan Lateral Pumping Plant No. 3, 20 1/2-miles south of Shiprock, New Mexico. Period of Performance: 02/01/2023 to 08/30/2025 00010 Description: Block 4a and 4b Construction Quantity: 1 Unit of Measure: AU (Activity Unit) Fixed-Price with Economic Price Adjustment See Schedule B for the price schedule continuation which includes all CLINS. Product/Service Code: Y1NE Product/Service Description: CONSTRUCTION OF WATER SUPPLY FACILITIES |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |