Similar Projects
Suffolk Avenue Commercial Building
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brentwood, NY 11717

Suffolk Avenue Commercial Building
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Brentwood, NY 11717

205 Osborn
Demolition, New Construction, Infrastructure - 4,000 SF
Design
$14,000,000 CJ est. value
Riverhead, NY 11901

205 Osborn
Demolition, New Construction, Infrastructure - 4,000 SF
Design
$14,000,000 CJ est. value
Riverhead, NY 11901

Bridge Rehabilitation - NY Route 27 (WB) over Barnes Road
Infrastructure
Bidding
$7,000,000 CJ est. value
Brookhaven, NY 11772

Bridge Rehabilitation - NY Route 27 (WB) over Barnes Road
Infrastructure
Bidding
$7,000,000 CJ est. value
Brookhaven, NY 11772

Wooden Walkways & Beach Dune Crossovers
Renovation, Alteration
Post-Bid
Fire Island, NY

Requirement Contract to Furnish and Install Asphalt Concrete on Town Roadways
Term Contract
Post-Bid
Lindenhurst, NY

Redevelop Neighborhood Road and Commack Road Area in Mastic Beach
Infrastructure
Results
Brookhaven, NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Beaver Dam Road Stormwater Management
Infrastructure
Construction
$419,878 CJ est. value
Brookhaven, NY 11752

Sunrise Highway Retail Building
Demolition, New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Bay Shore, NY 11706

7-Eleven - Flanders Road Gas Station Redevelopment / Riverhead
Demolition, New Construction, Infrastructure - 3,024 SF
Pending Verification
$800,000 CJ est. value
Riverhead, NY 11901

Concrete Pavement Repairs
Infrastructure
Conception
$9,900,000 CJ est. value
Babylon, NY 11702

AutoZone # 5683 / Lake Grove
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Saint James, NY 11780

Last Updated 09/27/2022 09:15 AM
Project Title

Connect Long Island - Nicolls Road BRT Corridor

Physical Address View project details and contacts
City, State (County) Centereach, NY 11720   (Suffolk County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A multimodal Nicolls Road corridor will provide connectivity between points of interest in the Innovation Zone, alleviate traffic congestion, and offer healthy travel alternatives to automobile usage. Serving as the foundation of the Long Island Innovation Zone, the Nicolls Road BRT will service transportation, research and educational assets between Stony Brook and Patchogue that may include: - Stony Brook LIRR Station - Stony Brook University and Hospital - Suffolk County Community Colleges Ammerman Campus - Ronkonkoma LIRR Station - Long Island MacArthur Airport - St. Josephs College - Downtown Patchogue - Patchogue Village LIRR Station with access to the Fire Island Ferries The Nicolls Road Corridor includes a High Occupancy Vehicle (HOV) component, proposed to alleviate traffic through the most congested portions of Nicolls Road. The new BRT/ HOV dedicated lane is proposed between Patchogue-Holbrook Road (CR-19) and Mark Tree Road. The proposed hike-bike trail component provides commuters with an additional transportation option that supports healthy lifestyle choices. The majority of the trail is proposed to be located off-road within the LIPA right of way, parallel to Nicolls Road. The northern portion of the trail connects to the Setauket Greenway Trail and extends south along the LIPA right of way to Patchogue-Holbrook Road where the trail will be on-road along CR-19 and other local roads until reaching the Fire Island Ferry Terminal in Patchogue. As of May 17, 2022, phase 1 construction is expected to take place between 2022 and 2024 and phase 2 will occur 2023-2025.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents