Similar Projects
Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision
Bidding
TX

Phase II Detention Improvements and Mass Grading for Sunset Grove Sections 3, 4, 5, & 6 & Partial Ambrose Section 1 and Ditch 9G Improvements
Bidding
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX 77591

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Sedona Section 7 Detention
Bidding
TX

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Reinforced Concrete Pipe, Curb Inlets, Catch Basins, and Joint Sealer Annual Contract
Term Contract
Bidding
Texas City, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Deer Ridge Buyout and Overland Flow Improvements
Bidding
$2,700,000 est. value
League City, TX 77573

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Last Updated 09/25/2020 03:14 PM
Project Title

Church Street Drainage Improvements 33rd - 37th

Physical Address View project details and contacts
City, State (County) Galveston, TX 77551   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the contract is for construction of the Church Street Storm Sewer System between 33rd Street and 37th Street including approximately 725 linear feet of 6’x2’storm sewer, 730 linear feet of 4’x2’ storm sewer and inlets. Also included is resurfacing of the roadway. A bid alternate include a sluice gate at the 37th Street outfall at the Ship Channel and cleaning of the line between the Ship Channel and Church Street.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents