Similar Projects
Bridge Building and Reconstruction
Term Contract
Post-Bid
TX

Bridge Creek Recreation Center Facility
Post-Bid
TX

Replace Bridge and approaches
Results
Less than $8,045,316 est. value
TX

Saginaw Bailey Boswell Overpass
Results
$11,500,000 est. value
TX

Brock Park Golf Course Bridge Replacement
Post-Bid
$875,000 est. value
Houston, TX 77078

Bridge Removal and Replacement Old Seguin-Luling Road at Mill Creek
Results
TX

West Lawther Drive Over Rush Creek, Bridge Replacement
Post-Bid
Dallas, TX 75201

Replace Bridge and Approaches
Results
Less than $74,921,950 est. value
TX

Bridge Building
Post-Bid
Henderson, TX 75652

Bridge Construction – CR 178
Results
$48,500 est. value
Carthage, TX 75633

Sh 130 2019 Bridge Rehabilitations (Bridges 36, 73 & 74)
Post-Bid
Buda, TX 78610

Bridge Repair Various Locations
Results
Less than $218,508 est. value
TX

Bridge Project
Post-Bid
Bellville, TX 77418

Brazos Bridge Over Smith Street and Holman Street (Deck Slab Replacement)
Results
$2,479,000 est. value
Houston, TX 77000

Guardrail and Bridge Railing Repairs and Related Items at Various Locations
Results
TX

Last Updated 09/09/2020 11:34 AM
Project Title

Yarbrough Drive Bridge Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79901   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,150,000 to $2,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Yarbrough Drive Bridge Replacement project consists of a bridge replacement, culvert replacement, pedestrian safety, providing ADA accessibility, and full-depth pavement rehabilitation. This project has been separated as Base Bids I, II, III and IV. Base Bid I consists of the replacement of the bridge along Yarbrough Drive crossing the Playa Drain, as well as the full depth pavement rehabilitation of the approaching roadway. The improvements include: proposed pavement, concrete curb & gutter (standard & rolled), driveways, sidewalks, and ADA ramps. Additional improvements include: traffic signal improvements and aesthetic pedestrian railing attached to the bridge rail on both sides of the bridge along Yarbrough Drive. Utility improvements consist of adjusting manhole covers, water meters and water valves. Access to all properties must be provided during construction. Base Bid II consists of replacing the existing 48-inch RCP culvert crossing Arvin Circle with two 10-foot by 7-foot box culverts and improvements to the approaching roadway. Base Bid III consists of relocating the water main along Arvin Circle. Base Bid IV consists of relocating the sanitary sewer main along Arvin Circle.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents