Similar Projects
Reported | 02/05/2021 12:00 AM |
Project Title | PSTA Flatwork Project Grouping, Sheltered |
Physical Address | View project details and contacts |
City, State (County) | Saint Petersburg, FL (Pinellas County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of new concrete bus stop pads at several locations. The general locations of the proposed Work for the Project are: ? Dali Boulevard, at southeast entrance to Dali Museum, between 1st Street South and Dan Wheldon Way, 1st Avenue South, between 2nd Street South and 3rd Street South (PTSA Bus Stop ID 8387), and 37th Street South, south of 34th Avenue South (PSTA Bus Stop ID 7171). The essential portions of the proposed Work for the Project are summarized as follows: Construction of concrete pads, sidewalks, curb and gutter, driveways, and construction of concrete gravity wall; signing and pavement marking. This is a SHELTERED BID for City Certified Small Business Enterprises only, as prime bidders. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |