Similar Projects
Boiler Replacement at Illing Middle School
Bidding
Manchester, CT 06040

South Windsor High School Heat Pump Replacements
Bidding
South Windsor, CT 06074

HVAC and Boiler Systems Preventative Maintenance Services 2019
Post-Bid
Hartford, CT

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Boiler Removal and Replacement
Results
Less than $34,735 est. value
Burlington, CT 06013

Calibration and Repair/Replacement Service of all Boiler Combustion and Burner Management Controls for the Energy Center Boilers
Term Contract
Results
New Britain, CT

HVAC Systems and Domestic Hot Water Upgrades
Post-Bid
Newington, CT 06111

Campus Water Management and Treatment Program
Results
Less than $300,000 est. value
New Britain, CT

Electric Water Heater Replacement at Arthur F. D`Amato Apartments (CT 5-9)
Post-Bid
New Britain, CT

J044--West Haven and Newington CT Boiler Plant Service and Maintenance
Results
New Haven, Newington, West Haven, CT 06516

Highcrest Elementary School Boiler Combustion Air and Ventilation Improvements
Post-Bid
Wethersfield, CT 06109

On Call Water Treatment Services for Boilers and Chillers
Term Contract
Results
New Britain, CT

Boiler Water Treatment
Term Contract
Post-Bid
Hartford, CT 06103

Rental of Temporary 5000 MBH GAS-Fired Boiler
Results
Enfield, CT

Boiler Tube Replacement at King Philip Middle School
Post-Bid
West Hartford, CT 06117

Last Updated 06/08/2020 08:46 AM
Project Title

Mechanical Improvements at South Side Elementary School

Physical Address View project details and contacts
City, State (County) Bristol, CT 06010   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the complete renovation the School's HAVC system from a 2-pipe changeover unit ventilator configuration to a hybrid 2-pipe/4-pipe energy recovery ventilators and 4-pipe fan coil system. Major equipment includes a split air-cooled chiller, fan coils, roof-mounted ERVs, indoor and roof mounted air handlers, and a new Web-based DDC BMS. The existing boilers will remain. Supporting work includes selective demolition, cutting and patching, new ceiling and lighting.

Details

Division 02 - Existing Conditions, Demolition.
Division 09 - Finishes, Ceilings.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents