Similar Projects
Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Bidding
Framingham, MA 01701

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Bidding
$125,000 est. value
Boston, MA

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Sub-Bidding
$8,400,000 est. value
Medfield, MA 02052

Redevelopment of Municipal Drinking Water Supply Wells
Post-Bid
Less than $20,000 est. value
North Reading, MA

Two Torque Flow Pumps
Post-Bid
Boston, MA 02129

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Install 2 Gravel Packed Wells
Results
Less than $230,000 est. value
Fairhaven, MA

Wells 3 and 4 Water Treatment Plant - General Bids
Bidding
$8,400,000 est. value
Medfield, MA 02052

Well Inspection/Maintenance and Repairs
Post-Bid
Less than $50,000 est. value
Edgartown, MA 02539

Installation of Landfill Gas Extraction Wells at the Crapo Hill Sanitary Landfill
Results
Less than $41,580 est. value
New Bedford, MA

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Bidding
Belmont, MA

Narrows Road Facility Hydrogenerator and Marshall Regulating Plant Pumps - General Bid
Post-Bid
Fitchburg, MA 01420

Water Treatment Plant (WTP) Modifications Well No 4 and 5 - General Bid
Results
Less than $1,350,000 est. value
Pembroke, MA 02359

Washington, House Generator and Fire Pump Upgrade - General Bids
Bidding
Amherst, MA

2020 Cleaning and Redeveloping of Kane and Chestnut Well 2
Post-Bid
Hudson, MA 01749

Reported 04/02/2021 12:00 AM
Project Title

Well 3 and One for Well 4

Physical Address View project details and contacts
City, State (County) Sandwich, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $28,000
Plans Available from State Agency - 03/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

Design, install and fully calibrate two magnetic flow meters, one for Well 3 and one for Well 4 at the Sandwich State Fish Hatchery. Water is pumped by submersible pumps, therefore, it will be necessary to locate and install the meters in below grade pits at a point along the discharge pipelines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents