Similar Projects
Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Bidding
Hyrum, Smithfield, UT 84335

Boiler
Bidding
Cedar City, UT

Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Millville Elementary School Chiller Project
Post-Bid
Millville, UT 84326

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Bidding
$125,000 est. value
Taylorsville, UT 84129

Design-Build Mechanical Upgrade at DISA
Post-Bid
$10,000,000 to $25,000,000 est. value
UT

Pleasant Grove High School Boiler Replacement
Results
Pleasant Grove, UT 84062

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

University of Utah High Temperature Water Converter Building 25
Term Contract
Results
$20,000 to $25,000 est. value
Salt Lake City, UT 84112

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

Last Updated 02/18/2021 04:34 PM
Project Title

DFCM Construction-Pre Qualified Mechanical Contractors-DNR Vernal Field House RTUS

Physical Address View project details and contacts
City, State (County) Vernal, UT   (Uintah County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demo existing air handlers AHU-1 and AHU-3, replace with new. Install new three-way valve and recirc pump for heating coils in both AHU. Demo existing exhaust fans EF-1, EF-2, EF-3 and EF-4 Replace with new. Provide new Merv-5 filters for bathroom group return grilles. Provide new Radon Control Exhaust Fans EF-5 and EF-6.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents