Similar Projects
King County Job Order Contract
Term Contract
Design
Seattle, WA 98164

Small Work Roster
Term Contract
Design
$300,000 CJ est. value
Burien, WA 98166

RFQ - Construction Safety Services
Term Contract
Bidding
$3,000,000 CJ est. value
Seattle, WA 98164

Pier 69 Janitorial Services
Term Contract
Sub-Bidding
Seattle, WA 98121

2023 Drydocking, Repair, and Maintenance of the Whatcom Chief Ferry
Term Contract
Sub-Bidding
Seattle, WA 98164

Facilities Landscape Maintenance
Infrastructure
Post-Bid
$45,000 est. value
Sammamish, WA

Parks Landscape Maintenance
Alteration
Post-Bid
$225,000 est. value
Sammamish, WA

Temporary Scaffolding Services
Term Contract
Results
WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Small Works Roster
Term Contract
Design
$350,000 CJ est. value
Seattle, WA 98164

Hazardous Materials Inspection, Testing and Abatement Work Order 2023
Term Contract
Sub-Bidding
Kent, WA 98032

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Light Rail Vehicle Electronic Suite Upgrade
Term Contract, Infrastructure, Alteration
Post-Bid
Seattle, WA

Biosolids Beneficial Use Services
Term Contract
Post-Bid

RFQ D/B - NAVFAC Northwest Multiple Award Construction Contract
Term Contract
Post-Bid
$100,000,000 CJ est. value
Seattle, WA 98164

Last Updated 03/20/2023 03:12 PM
Project Title

2023 Drainage Catch Basin Inspection and Data Collection Services

Physical Address View project details and contacts
City, State (County) Lake Forest Park, WA 98155   (King County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lake Forest Park, WA ("the City") seeks bids from qualified municipal separate storm sewer system (MS4) inspection service providers ("Bidder" or "Contractor") to inspect and collect attribute data from approximately 1,650 City-maintained drainage catch basin structures located primarily in City Right of Way ("Work"). Deadline for Questions March 13, 2023 12:00 p.m. 1. All Work will be performed within the incorporated limits of the City of Lake Forest Park, WA. 2. All Work is expected to occur on public property including City right of way and Cityowned parcels. If Work must be performed on private property, the City will obtain Right of Entry from property owners prior to the Contractor's execution of the Work. 3. References herein to the "Work site" are meant to refer to the locations of existing Citymaintained catch basin structures where the Contractor will perform the Work. These catch basin locations are shown on the GIS map accessible at this link. 4. Work may be required on uneven terrain, steep slopes, and at other locations that may be difficult to access. However, Work sites are assumed to be accessible on foot and without the need for extensive brush clearing or other site preparation work.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents