Similar Projects
Capitol Skylight Replacement and Stained Glass Reinstallation
Alteration
Bidding
$364,301 est. value
Hartford, CT

Stanley Golf Course Post Clock
Post-Bid
New Britain, CT 06053

Slab and Coating Repair (H)
Alteration
Post-Bid
Hartford, CT

Removal of a Staircase at Manchester High School
Results
Manchester, CT 06040

J Building Roof Access Ladder
Results
Farmington, CT 06030

Roof Stairs and Equipment Improvements
Alteration
Post-Bid
Hartford, CT

Installation of Safety Railings and Acoustical Ceiling
Results
Hartford, CT 06106

Window & Siding Replacement
Alteration
Post-Bid
Enfield, CT 06082

Burr & Naylor School Bathroom Improvements
Results
$180,000 est. value
Hartford, CT 06114

New and Modified Casework
Alteration
Post-Bid
Berlin, CT 06023

Installation of Awnings at Manchester Public Schools Administrative Offices
Results
Manchester, CT

Window Replacement & Exterior Improvements
Alteration
Post-Bid
Manchester, CT 06040

Building Infrastructure Upgrades - Ladder Replacement
Alteration
Results
Hartford, CT

Curtain Wall and Canopy Repairs at Manchester Community College
Alteration
Post-Bid
$423,155 est. value
Manchester, CT 06040

Suffield Stair Tread Replacement
Alteration
Results
Suffield, CT 06078

Reported 06/17/2022 12:00 AM
Project Title

Building B Precast Panel Repair

Physical Address View project details and contacts
City, State (County) Farmington, CT   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Facade Panel Investigation, it has been recommended that the suspect panel be removed to fully assess the cause of the displacement and to develop a means for repair. This work will necessarily require removal of all panels above the suspect panel in order to minimize damage to adjacent facade panels and require that repair details be developed during construction as the defective conditions of the displaced panel are revealed

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents