Similar Projects
Reported | 07/24/2021 12:00 AM |
Project Title | USACE Folsom Trail Relocation |
Physical Address | View project details and contacts |
City, State (County) | Folsom, CA (Sacramento County) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contract objective is to repair, reconstruct, and re-route existing trail facilities within the Folsom Lake State Recreation Park Area. The following actions are required: • Repair and reconstruct 9,500 feet of the Beals Point to Granite Bay Trail (from Beals Point Entrance Road to the north end of Dike 4) • Repair and reconstruct 2,300 feet of the Pioneer Express Trail (from Beals Point Entrance Road south to the paved bike path) in order to safely accommodate the trail traffic that will be displaced from the tops of Dikes 4, 5 and 6 during the Dam Raise Project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |