Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

New District Courts Facility - 2022 Bond - City of Little Rock
New Construction
Conception
$8,500,000 CJ est. value
Little Rock, AR 72201

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

Thibault Road Relocation
Infrastructure
Bidding
$300,000 CJ est. value
Little Rock, AR 72206

Thibault Road Relocation
Infrastructure
Bidding
$300,000 CJ est. value
Little Rock, AR 72206

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Little Rock Afb Civil Works
Term Contract
Post-Bid
$79,000,000 est. value
Jacksonville, AR 72078

Adams Field and Fourche Creek Remediation
Infrastructure
Results
Little Rock, AR

Cammack Village Multiple Drainage Improvements
Infrastructure
Results
Less than $110,000 est. value
Cammack Village, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

Last Updated 03/01/2023 11:03 PM
Project Title

Maumelle Drainage Project

Physical Address View project details and contacts
City, State (County) Maumelle, AR 72113   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,579,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes Jacking/ tunneling of pre-cast RC box culverts under UP Railroad Spur; excavating diversion channel; remove and replace CMP culverts with pre-cast RC box culverts; construct cast-in-place concrete wing walls etc. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond and other contract documents may be examined at the following locations: ETC Engineers & Architects, Inc. 1510 South Broadway Little Rock, AR 72202 Southern Reprographics, Inc. Plan Room Services 901 West 7th Street Little Rock, AR 72201 City of Maumelle City Hall 550 Edgewood Drive, Suite 590 Maumelle, AR 72113 Obtaining contract documents through any source other than the Engineer/Architect listed above, or its representative(s) is not advisable due to the risks of receiving incomplete or inaccurate information, and the bidder runs the risk of basing bidder's proposal on such information. The documents obtained through the Engineer/Architect, or his representative(s) are considered to be the official version and takes precedence if any discrepancies occur. Bids will be accepted only from official bid document holders. A certified check or bank draft, payable to the order of the City of Maumelle, negotiable U.S. Government bonds (at par value), or satisfactory bid bond executed by the bidder and an acceptable surety in an amount equal to five (5%) of the total bid shall be submitted with each bid. The City hereby notifies all bidders that this contract is subject to applicable labor laws, non-discrimination provisions, wage rate laws and other federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on the project, and that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The City reserves the right to reject any or all bids or to waive any informality in bidding. Bids may be held by the City for a period not to exceed Sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. Union Pacific Requirements Apply.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents