Similar Projects
Oneline Transportation Corridor Development - City of Jackson
Infrastructure
Conception
$10,000,000 CJ est. value
Jackson, MS 39217

Mississippi Clean Hydrogen Hub
New Construction, Infrastructure
Conception
$3,000,000,000 CJ est. value
Jackson, MS 39201

Main Street Mixed-Use Development
New Construction, Infrastructure - 36,000 SF
Design
$10,000,000 CJ est. value
Madison, MS 39110

Beach Boulevard Multi Residential Development / Biloxi
New Construction, Infrastructure
Design
$15,088,000 CJ est. value
Biloxi, MS 39531

Erosion Control Repairs Nrcs Curtis Luster Road Site 1 Whitaker Road & Midway Road
Infrastructure
Bidding
$240,000 CJ est. value
Port Gibson, MS 39150

Carrollton Drainage Improvements
Infrastructure
Bidding
$128,173 CJ est. value
Carrollton, MS 38917

Phase 1 Historical Rehabilitation, Wechsler School 1951 Addition
Addition, Demolition, Infrastructure
Post-Bid
$700,000 CJ est. value
Meridian, MS 39301

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

2021 Wastewater Treatment Plant Improvements, Phase 2
Renovation
Results
Cleveland, MS

Roadway Maintenance Program - 2022 Annual Bid
Term Contract
Results
Tupelo, MS

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Hillside Baptist Church / Harrison County
New Construction, Infrastructure - 4,320 SF
Pending Verification
$750,000 CJ est. value
Gulfport, MS 39503

Tiny Home Community Multi-Residential Development / Biloxi
New Construction, Infrastructure
Design
$9,430,000 CJ est. value
Biloxi, MS 39532

Last Updated 05/08/2023 02:09 PM
Project Title

Contract A - 2020 Rural Development Glen Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Corinth, MS 38834   (Alcorn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work - A telemetry/SCADA system that will: 1) regulate the wells feeding the plant, 2) control the internal functioning of the plant and 3) communicate plant status to the remotely located ACWA business office. An induced-air aeration unit to begin the manganese and iron oxidation process. the ACWA office on 116 South Cass Street in Corinth, MS. Direct all questions in writing to Hethcoat & Davis, Inc. at the address noted above. Contract A - 2020 Rural Development Glen Water Treatment Plant. Contract Number: 1154-05A Owner anticipates that the Projects total bid price will be approximately $7,500,000. The Project has an expected duration of 540 days Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents