Similar Projects
SR 6 to Springfield Rd -
Infrastructure, Alteration
Conception
$670,000 est. value
PA

Erie's Bayfront Parkway Multimodal
Infrastructure, Alteration
Design
$66,919,254 est. value
Erie, PA 16511

PA 68 Corridor Improvements
Alteration
Design
$13,184,467 est. value
Butler, PA 16003

Fort Indiantown Gap - Rehabilitate PA Veteran's Memorial Cemetery
Bidding
$2,100,000 to $3,100,000 est. value
Annville, PA 17003

2021 Street Sweeping
Post-Bid
Exton, West Chester, PA 19341

2021 District Wide Bridge Cleaning
Post-Bid
$500,000 to $999,999 est. value

Qualifications for Vacant Land Stabilization and Vacant Land Maintenance
Results
Philadelphia, PA

Gravel Pit Reclamation
Results
$29,500 est. value
Waterford, PA 16441

309 Center Valley IC
Infrastructure, Alteration
Design
$44,845,035 est. value
Tamaqua, PA 18252

Dust Control
Post-Bid
Montrose, PA 18801

2021-2022 Snow Plowing and Salt Application
Term Contract
Results
Warrington, PA

Interstate 84 Cable Median Barrier
Infrastructure
Design
$350,000 est. value
Dunmore, PA 18512

Street Sweeping
Post-Bid
Mount Lebanon, PA

Township Annual Maintenance Contract
Term Contract
Results
Linwood, PA

US 20: Chestnut St to Imperial Parkway
Infrastructure, Alteration
Design
$2,294,838 est. value
Girard, PA 16417

Reported 07/12/2022 12:00 AM
Project Title

Dust Control Bid

Physical Address View project details and contacts
City, State (County) Bradford, PA   (McKean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Columbia Township Board of Supervisors will be accepting bids for 100% plant-based dust control product to be applied by supplier to roads in the Township. Application rate is to be one gallon per sixty square feet to cover 250,000 square feet, more or less.

Details

Division 01 - General Requirements, Temporary Controls, Site Watering for Dust Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents