Similar Projects
Last Updated | 05/11/2023 09:26 AM |
Project Title | 2023 Lakeside Pass Road and Santa Clara Road 12" Water Main Extensions |
Physical Address | View project details and contacts |
City, State (County) | Marion, TX 78124 (Guadalupe County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $906,673 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 03/10/2023 at 10:00 AM CT All questions must be submitted by Please email all questions to: brandonk@uegpros.com A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site. B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference. C. Bidders visiting the Site are required to arrange their own transportation to the Site. D. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the following Owner or Engineer contact for visiting the Site: Utility Engineering Group, PLLC, Ph: 830.214.0521. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |