Similar Projects
UPS Replacement
Alteration
Bidding
San Antonio, TX

Annual Job Order Contract for On-Call Electrical Services - Citywide
Alteration
Bidding
San Antonio, TX

Kirby Middle School Lighting Project
Post-Bid
San Antonio, TX 78219

833rd COS Commercial Internet
Post-Bid
San Antonio, TX 78227

Installation of Shelters, Accessories and Solar Lighting
Results
San Antonio, TX 78200

Leon Creek Wrc Electrical System Improvements - Phase I Project
Results
Less than $5,772,027 est. value
San Antonio, TX 78212

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Electrical, Communication Services
Results
San Antonio, TX 78236

Lighting, Mechanical and Fire Alarm Upgrades at Various Campuses
Post-Bid
Less than $397,000 est. value
San Antonio, TX 78250

Maintenance of Facility Lighting
Results
Less than $69,775 est. value
San Antonio, TX 78212

Generator Replacement
Post-Bid
San Antonio, TX 78210

Emergency Generator Testing and Repair
Results
San Antonio, TX 78223

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

UVC Lighting Project for HVAC Systems
Results
Less than $1,704,559 est. value
San Antonio, TX 78204

Facility A/C Bacnet Repair
Post-Bid

Last Updated 10/13/2021 08:15 AM
Project Title

Steven M. Clouse WRC Electrical System Improvements - Phase 2A Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78275   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $19,575,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of improvements to the plant’s 15 kV electrical distribution system to support other equipment to be installed; electrical and I&C improvements to, headworks, primary clarifiers, solids thickening; construction of a new building to house all equipment associated with the new supervisory control and data acquisition (SCADA) and information technology systems; construction of prefabricated buildings and associated foundations to house motor control centers; new Rockwell PlantPAx System; installation of duct banks for new plant wide fiber optic communication network; field instrumentation required to connect to the new Rockwell PlantPAx system; installation of workstations throughout the SMC WRC and additional workstations at the Leon Creek Water Recycling Center and Medio Creek Water Recycling Center; and, all other associated improvements as described in the Contract Documents for the Steven M. Clouse WRC Electrical System Improvements – Phase 2A Project

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents