Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2022 Pavement Rehabilitation
Infrastructure
Bidding
Portage, WI

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Portage - Fox Lake, 0.13 Mi. e. Of Jackson Street To Sth 22
Infrastructure
Bidding
WI

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

Health Care Center Sidewalk
Infrastructure
Bidding
Wyocena, WI 53969

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

2021 Gay Street Improvements
Results
Lodi, WI 53555

2021 Pavement Rehabilitation
Post-Bid
$186,388 est. value
Portage, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Fill, Emulsified Sealer/Binder and Pavement Marking
Post-Bid
Wisconsin Dells, WI 53965

Last Updated 03/17/2022 01:37 PM
Project Title

2022 Alley Improvement

Physical Address View project details and contacts
City, State (County) Portage, WI   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous paving, asphalt removal, unclassified excavation, C.A.B.C., concrete removal, concrete curb, sidewalk and driveway approaches (All quantities are approximate). • Alley Reconstruction – Bituminous asphalt alley resurfacing includes approximately 3,400 S.Y. asphalt pavement removal on 3 alleys and approximately 3,400 S.Y. of bituminous asphalt pavement construction at three alleys. Remove and replace 165 LF of Curb and Gutter and 207 SY of 6” concrete sidewalks and driveway approaches. • Alternate Bid; Alley 79 Reconstruction– (Gravel Alley) Bituminous asphalt alley resurfacing includes approximately 800 S.Y. of bituminous asphalt pavement construction. Remove and replace 45 LF of Curb and Gutter and 60 SY of 6” concrete sidewalks and driveway approaches.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents