Similar Projects
High School Library
Renovation
Conception
Clayton, MO 63105

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

Ritenour High School Toilet Room 211
Renovation
Post-Bid
Saint Louis, MO 63114

Disaster Recovery Services
Results

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

Normandy High School Secured Connector
Addition - 25,878 SF
Results
Normandy, MO 63121

Press Box Renovation
Renovation
Post-Bid
Saint Louis, MO

Summer 2021 Building Renovations and Site Improvements
Renovation
Results
MO

Affton High School Field
Renovation
Post-Bid
Saint Louis, MO 63123

West High Electrical Substation Pre-Purchase
New Construction
Results
Ballwin, MO 63011

Affton High School Dugout Renovation
Renovation
Post-Bid
Saint Louis, MO 63123

Summer 2021 Building Improvements
Renovation
Post-Bid
Chesterfield, Creve Coeur, Manchester, Saint Louis, MO 63141

Parkway South High Balcony Waterproofing Replacement
Renovation, Alteration
Post-Bid
Manchester, MO 63021

Summer 2022 Building Bid Package A
Renovation
Post-Bid
Chesterfield, MO

Reported 12/30/2021 12:00 AM
Project Title

Affton High School and Rogers Middle School Bathroom

Physical Address View project details and contacts
City, State (County) Affton, MO 63123   (Saint Louis County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work involves the rework of existing ceilings, walls, flooring, electric, plumbing and exhaust ventilation. Installation of floor to ceiling maximum privacy toilet partitions, new ceiling recessed led lighting, plumbing fixtures and accessories. The High School restroom shall have 2 ADA Compliant lavatory sinks and toilet stalls. Rogers Middle School shall have 1 ADA Compliant lavatory sink and toilet stall.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents