Similar Projects
Clermont Distilling Co
New Construction
Conception
$13,400,000 est. value
Clermont, KY 40110

Copper Company Manufacturing Plant
New Construction
Conception
$250,000,000 est. value
Shelbyville, KY 40065

Twin Battery Plants
New Construction
Design
$5,800,000,000 est. value
Glendale, KY

Project Maverick / Eurofins Greenfield Genomic Production Building
New Construction - 71,200 SF
Design
$8,000,000 est. value
Louisville, KY 40299

Manufacturing Facility
New Construction - 500,000 SF
Post-Bid
Elizabethtown, KY

Speculative Building Fit-Up for Pennington Stave Company
New Construction, Renovation - 30,000 SF
Post-Bid
Edmonton, KY 42129

T. Marzetti Food Manufacturing Facility
Addition - 184,500 SF
Construction
$133,000,000 est. value
Horse Cave, KY 42749

Brown-Forman Expanding Louisville Distillery Operation
New Construction - 896,465 SF
Construction
$95,000,000 est. value
Louisville, KY

Manufacturing Warehouse Development
New Construction - 380,000 SF
Pending Verification
$60,000,000 est. value
Simpsonville, KY 40067

Logan Premium Meats
New Construction - 10,500 SF
Pending Verification
$4,000,000 est. value
Russellville, KY 42276

House Foods America Corp Manufacturing Plant
New Construction - 350,000 SF
Conception
$146,300,000 est. value
Louisville, KY

Warehouse and Production Expansion
Addition
Construction
Frankfort, KY

Bitcoin Mining Facility
New Construction
Pending Verification
$50,000,000 est. value
Paducah, KY

Blue Oval SK Battery Park
New Construction
Conception
$5,600,000,000 est. value
Glendale, KY

Steel Production Facility
New Construction - 50,000 SF
Construction
$8,000,000 est. value
Bowling Green, KY

Reported 07/14/2022 12:13 PM
Project Title

Summit Polymers Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Lawrenceburg, KY 40342   (Anderson County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $37,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 140,000 square foot manufacturing facility. As of April 29, 2022, this project is in planning. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed, but construction could begin in third quarter 2022 and is expected to be complete in June 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents