Similar Projects
Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Design
West Glacier, MT 59936

2021 Water System Improvements
Infrastructure, Alteration
Bidding
$4,051,000 est. value
Bigfork, MT 59911

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Bidding
Poplar, MT 59255

Hudson Bay Divide South
Infrastructure
Post-Bid

Hudson Bay Divide South
Infrastructure
Post-Bid

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Bridge Deck Repair and Mill and Fill
New Construction, Infrastructure
Bidding
MT

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Grade, Gravel, Plant Mix Surfacing, and Seal and Cover on US-HWY 89
Infrastructure
Bidding
MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Reconstruct Existing Two-Way Stop-Controlled Intersection
Infrastructure
Bidding
Billings, MT 59106

Grading, Gravel Surfacing, Plant Mix Surfacing, Bridge Replacement, Guardrail installation, Drainage, Signing and Pavement Markings
New Construction, Infrastructure
Results
MT

Existing Surface and Provide a New Plant Mix Surface
Infrastructure
Bidding
MT

Plant Mix Surfacing
Infrastructure
Results
MT

Last Updated 09/29/2021 11:52 AM
Project Title

Mt Bighorn Warman Loop Road

Physical Address View project details and contacts
City, State (County) MT   (Big Horn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of sub-excavation, drainage, paving and minor bridge work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Excavation and Fill.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents