Similar Projects
Post Road Building, HVAC Rooftop Unit Replacement
Alteration
Bidding
$150,000 est. value
Austin, TX

Kin AHU Replacement Kinsolving Dormitory
Alteration
Bidding
$2,000,000 to $2,750,000 est. value
Austin, TX

HVAC Upgrade, Flight Services
Post-Bid
Less than $293,000 est. value
Austin, TX 78744

CCRC Walk-in Cooler/Freezer
Post-Bid
Austin, TX 78756

HVAC Upgrades and Replacements
Results
Pflugerville, TX 78660

HVAC Equipment, Supplies and Installation
Results
Austin, TX 78759

Merv13 Filters
Post-Bid
Austin, TX 73301

HVAC Repair and Installation
Results
$61,503 est. value
Austin, TX 78751

Dust Collection System
Post-Bid
Austin, TX 78703

HVAC Maintenance and Mechanical Services
Results
Less than $69,370 est. value
Austin, TX 78701

7.5 Ton HVAC Unit
Post-Bid
Austin, TX 78767

HVAC PM, Diagnostic and Repair at RGSC Harlingen
Results
Austin, TX 78756

Del Valle HS HVAC and Roofing Replacement
Post-Bid
Del Valle, TX 78617

HVAC and Building Improvements
Renovation
Results
$1,350,000 to $1,600,000 est. value
Austin, TX 78703

HVAC Replacement at Popham ES, Hillcrest ES, and Del Valle ES Campuses
Post-Bid
Austin, Del Valle, TX 78617

Last Updated 11/12/2021 10:23 AM
Project Title

HVAC Plasma Filtration Units for Air Handlers

Physical Address View project details and contacts
City, State (County) Austin, TX   (Travis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,523
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase, Delivery and installation of HVAC plasma filtration systems (each, a “Unit” and, collectively, “Units”) in each air handler located at each of ten (10) Integral Care-owned facilities (collectively, the “Services”). Units must be self-contained and operate in a manner that can purify the air by eliminating airborne particulates, odors, and pathogens, as well as eliminate or reduce volatile organic compounds, or VOCs. Units must be be auto-cleaning, duct-mounted, and achieve a UL 867 Ozone standard.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents